小间距重叠隧道施工对高架桥托换桩基的影响分析
Analysis of the Influence of the Small Space Overlapping Tunnel Construction on Underpinning Pile Foundation of Viaduct

DOI: 10.12677/HJCE.2021.101005, PP. 42-47

Keywords: 盾构重叠隧道,桩基托换,托换桩长,数值模拟,变形分析
Overlapping Shield Tunnel
, Pile Foundation Underpinning, Pile Length, The Numerical Simulation, Deformation Analysis

Full-Text   Cite this paper   Add to My Lib

Abstract:

本文根据深圳地铁7号线笋岗站–洪湖站区间左线隧道穿越彩虹桥的桩基工程案例,借助MIDAS-GTS有限元软件,建立三维模型,对上下重叠隧道先后穿越城市高架托换桩基的过程进行模拟分析,得出托换桩基变形的规律。并在工程案例的基础上,建立三组模型,分析重叠隧道开挖的先后顺序、托换桩基的长度、上下两隧道的间距等因素对托换桩基变形的影响。
Based on the pile foundation engineering case of left line tunnel between Sungang station and Honghu station of Shenzhen Metro Line 7 passing through Caihong bridge, this paper establishes a three-dimensional model with the help of midas-gts finite element software to simulate and analyze the process of upper and lower overlapping tunnels successively passing through urban elevated underpinning pile foundation, and obtains the deformation law of underpinning pile foundation. On the basis of engineering cases, three groups of models are established to analyze the influence of the excavation sequence of overlapping tunnels, the length of underpinning pile foundation and the distance between the upper and lower tunnels on the deformation of underpinning pile foundation.

References

[1]  冯国冠. 基于某地铁盾构隧道施工地表沉降规律分析研究[J]. 中国安全生产科学术, 2010, 6(4): 81-84.
[2]  熊巨华, 王远, 刘侃, 孙庆. 隧道开挖对邻近单桩竖向受力特性影响[J]. 岩土力学, 2013, 34(2): 475-482.
[3]  王振飞, 张成平, 王剑晨, 于富才, 苏洁. 新建地铁车站近距离上穿既有地铁区间隧道施工方案的选择[J]. 中国铁道科学, 2013, 34(5): 63-69.
[4]  李怀鉴, 张桂扬. 大断面连拱隧道暗挖工法数值模拟研究[J]. 石家庄铁道大学学报(自然科学版), 2013, 26(2): 51-55.
[5]  边浩. 盾构施工对高架桥托换桩基变形的影响分析[D]: [硕士学位论文]. 武汉: 中国地质大学, 2018.
[6]  欧平. 上下重叠隧道盾构施工对托换桩基影响的数值分析[D]: [硕士学位论文]. 广东: 暨南大学, 2016.