国际工程PC项目中甲供、甲控乙办采购管理模式应用分析
|
Abstract:
随着我国承包商在国际工程市场中竞争力不断增强,工程承包模式逐渐发生变化,采购管理模式也趋于多样化,承包商需要具备更高的采购管理水平。鉴于当前国际工程采购管理的研究中缺少关于甲供、甲控乙办模式的应用分析,通过文件调研、专家访谈和典型项目经验收集,对国际工程PC项目中甲供、甲控乙办采购管理模式的应用进行研究。研究结果揭示了国际工程PC项目中甲供、甲控乙办采购管理模式的难点及风险规避方案,并提出了提高国际工程项目采购管理能力的策略。
With the increasing competitiveness of Chinese contractors in the international engineering market, the project contracting mode is constantly changing, and the procurement management mode tends to be diversified, so contractors need to have a higher level of procurement management. In view of the lack of application analysis on the procurement management modes supplied by the employer and managed by the contractor & controlled by the employer, this paper conducts research on the procurement management of international engineering PC project through document investigation, expert interview and collection of typical project experience. The research results reveal the difficulties in the procurement management modes supplied by the employer and managed by the contractor & controlled by the employer in international engineering PC project and the risk avoidance scheme, and put forward the strategies to improve the procurement management ability in international engineering project.?
[1] | 石宣喜, 张旭腾. 国际工程EPC项目采购管理案例研究[J]. 项目管理技术, 2018, 16(9): 38-41. |
[2] | 刘薇, 刘畅, 邓慧敏. 浅谈国际工程项目物资采购风险及控制[J]. 工程技术(文摘版), 2017, 36(3): 198. |