|
浅析沙特阿美项目焊工管理模式
|
Abstract:
焊接质量控制是管道项目的核心,而焊工是焊接质量的基础。有效的焊工管理不仅可以控制生产成本,还可以预防质量安全隐患。本文结合阿美规范要求及实际工作应用,阐述了阿美项目焊工考试要求、焊工考试流程、焊工考核管理及焊工证书维护管理,旨在为国内外中方质量管理人员提供借鉴,确保焊工管理可控、合理有效。
Welding quality control is the vital core of pipeline project, and welder is the foundation of welding quality. Effective welder management not only controls production costs, but also prevents potential quality and safety hazards. The paper combines the requirements of Aramco specifications and practical work applications to explain the requirements for welder exams, welder exam procedures, welder assessment management and welder certificate maintenance management, aiming to provide reference for quality management personnel at home and abroad to ensure that welder management is controllable, reasonable and effective.
[1] | 赵进忠, 王志红. 规范焊工资质管理, 确保焊接施工质量[J]. 中国工程建设焊接论坛, 2018, 47(9): 15-17. |
[2] | 程晋宜. 基于过程控制的焊工资源管理系统开发[J]. 电焊机, 2018, 48(2): 69-72. |
[3] | Saudi Aramco Consulting Ser-vice Department (2017) Saudi Aramco Approved WQT Contractor List. Saudi Arabia: |
[4] | ASME Boiler and Pressure Vessel Committee on Welding, Brazing, and Fusing (2013) ASME SEC IX, Welding, Brazing, and Fusing Qualifica-tions. The American Society of Mechanical Engineers. |
[5] | Inspection Engineering Standards Committee (2014) SAEP-321 Saudi Aramco Welders Performance Qualification and Tracking Requirements. Saudi Aramco, Saudi Ara-bia. |
[6] | Inspection Engineering Standards Committee (2014) SAEP-323 Contract Welders and Brazers Performance Qualification Testing and Tracking Requirements. Saudi Aramco, Saudi Arabia. |
[7] | Project Quality Standards Com-mittee (2016) SAEP-324 Certification Review and Registration of Project Welders. Saudi Aramco, Saudi Ara-bia. |
[8] | Inspection Engineering Standards Committee (2014) SAES-W-11 Welding Requirements for On-Plot Pipes. Saudi Aramco, Saudi Arabia. |
[9] | Inspection Engineering Standards Committee (2015) SAES-W-12 Welding Require-ments for Pipelines. Saudi Aramco, Saudi Arabia. |