The resultant disgusting effect related to failure to produce
environmental friendly tailing slurry, call for developing a good management
plan for tailing slurry production of the newly introduce dry tailing machine
at the Gold Processing Plant of Pakay Gold Company Ghana Limited.Hence, the tailing slurry
management plan consists of documented steps put together to enhance the
discharge of environmentally acceptable tailing product for further monitoring
and usage. The nonexistence of a plan for managing input (40% solid slurry) and
output (product) of the tailing filtration plant (dry tailing machine) at Pakay
Gold Company is a recipe for systemic disaster which points to the potential of
legislative litigation with production and revenue shortfalls. This points out the need for this
paper’s assessment of plant slurry threats or opportunities, setsan objective for management plan, develops premises and identifies alternatives of the tailing
slurry input and product to enhance the development of a plan for managing the
dry tailing machine. Furthermore, additional management plan steps that
followed were examination and selection of alternative action plan for
environmental toxic prevention model. Moreover, plan for implementation as well
as supporting plans and review measures were done to eliminate any future
legislative agencies litigation. The aim of this paper is to provide tailing
slurry management plan that will ensure the eradication of any potential
adverse environmental effect and litigation phenomenon that may be associated
with the products of the tailing slurry filtration plant.
References
[1]
American Society for Quality (2019). Quality Assurance & Quality Control.
https://asq.org/quality-resources/quality-assurance-vs-control
[2]
Bhasin, H. (2017). Management Planning Process—All You Should Know.
https://www.marketing91.com/management-planning-process/
[3]
Carroll, A. B. (1993). Three Types of Management Planning: Making Organizations Work.
https://www.questia.com/library/journal/1G1-14442425/three-types-of-management-planning-making-organizations
[4]
Chanda, E., Thomsen, E. K., Musapa, M., Kamuliwo, M., Brogdon, W. G., Norris, D. E. et al. (2016). An Operational Framework for Insecticide Resistance Management Planning. Emerging Infectious Diseases, 22, 773-779.
https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4861508/
[5]
Community Tool Box (2018). Developing a Management Plan. https://www.ctb.ku.edu
[6]
Engels, J. (2017). What Are Tailings?—Their Nature and Production.
http://www.tailings.info/basics/tailings.htm
[7]
Ghana Minerals Commission (2012). Minerals and Mining (Health, Safety and Technical) Regulations, 2012. GPCL/A648/350/09/2012. Accra: Ghana Publishing Company Ltd, Assembly Press. http://extwprlegs1.fao.org/docs/pdf/gha168930.pdf
[8]
Haigen, L., & Longzong, Y. (1997). Primary Design for Eassse Gold Mine of Sian Goldfields Limited, Ghana (pp. 4-1-4-23). Lanzhou: Lanzhou Engineering and Research Institute for Non-Ferrous Metallurgy.
[9]
iEduNote (2021). Create Effective Plan in 8 Steps (Planning Process).
https://www.iedunote.com/create-effective-plan
[10]
Lewis, M. R. (2019). How to Write a Management Plan.
https://www.wikihow.com/Write-a-Management-Plan
[11]
Logsdon, M. J., Hagelstein, K., & Mudder, T. I. (1999). The Management of Cyanide in Gold Extraction (pp. 19-31). Ottawa: International Council on Metals and the Environment. http://www.icme.com
[12]
Misra et al. (2003). Cyanide Detoxification Process.
https://patentimages.storage.googleapis.com/19/d7/11/f37de07a9833f6/US6551514.pdf
[13]
Mullane, T. (2015). The Basic Steps in the Management Planning Process.
https://www.linkedin.com/pulse/basic-steps-management-planning-process-terry-mullane/
[14]
Northern Sydney Institute (2016). Manage Operational Plan: Develop Operational Plan Learning Guide.
https://nsfsakai.nthsydney.tafensw.edu.au/access/content/group/0f4ea869-0e76-4936-b16e-7407f58a3a5d/ManagementAndSmallBusiness/Manage%20Operational%20Plan/documents/
bsbmgt517_learning_guide_topic_1_v1_36.pdf
[15]
Olusanya, S. O., Awotungase, S. A., & Ohadebere, E. C. (2012). Effective Planning and Organisational Productivity. (A Case Study of Sterling Bank Nigeria Plc). IOSR Journal of Humanities and Social Science, 5, 31-39.
http://www.iosrjournals.org/iosr-jhss/papers/Vol5-issue5/D0553139.pdf
https://doi.org/10.9790/0837-0553139
[16]
Smith, T. (2019). Qualitative Analysis. Fundamental Analysis.
https://www.investopedia.com/terms/q/qualitativeanalysis.asp
[17]
Timmerman, J. (2019). Key Elements to a Successful Outsourcing Experience.
https://www.devsutd.com/key-elements-to-a-successful-outsourcing-experience/
[18]
Yeboah, O., & Arthur, S. (2017). Expressing Efficiency as a Function of Key Performance Control Parameters: A Case Study of Hydrocyclone Unit Process at Josay Goldfields Limited, Tarkwa, Ghana. Open Journal of Business and Management, 5, 476-486.
https://www.scirp.org/journal/paperinformation.aspx?paperid=77540
https://doi.org/10.4236/ojbm.2017.53041