Management Plan for Tailing Slurry at Gold Processing Plant: Case Study Pakay Gold Company Limited

DOI: 10.4236/ojbm.2021.91017, PP. 309-326

Keywords: Tailing, Slurry, Filtration, Opportunities, Legislative, Litigation, Toxic, Plan and Alternative

Full-Text   Cite this paper   Add to My Lib

Abstract:

The resultant disgusting effect related to failure to produce environmental friendly tailing slurry, call for developing a good management plan for tailing slurry production of the newly introduce dry tailing machine at the Gold Processing Plant of Pakay Gold Company Ghana Limited. Hence, the tailing slurry management plan consists of documented steps put together to enhance the discharge of environmentally acceptable tailing product for further monitoring and usage. The nonexistence of a plan for managing input (40% solid slurry) and output (product) of the tailing filtration plant (dry tailing machine) at Pakay Gold Company is a recipe for systemic disaster which points to the potential of legislative litigation with production and revenue shortfalls. This points out the need for this paper’s assessment of plant slurry threats or opportunities, sets an objective for management plan, develops premises and identifies alternatives of the tailing slurry input and product to enhance the development of a plan for managing the dry tailing machine. Furthermore, additional management plan steps that followed were examination and selection of alternative action plan for environmental toxic prevention model. Moreover, plan for implementation as well as supporting plans and review measures were done to eliminate any future legislative agencies litigation. The aim of this paper is to provide tailing slurry management plan that will ensure the eradication of any potential adverse environmental effect and litigation phenomenon that may be associated with the products of the tailing slurry filtration plant.

References

[1]  American Society for Quality (2019). Quality Assurance & Quality Control.
https://asq.org/quality-resources/quality-assurance-vs-control
[2]  Bhasin, H. (2017). Management Planning Process—All You Should Know.
https://www.marketing91.com/management-planning-process/
[3]  Carroll, A. B. (1993). Three Types of Management Planning: Making Organizations Work.
https://www.questia.com/library/journal/1G1-14442425/three-types-of-management-planning-making-organizations
[4]  Chanda, E., Thomsen, E. K., Musapa, M., Kamuliwo, M., Brogdon, W. G., Norris, D. E. et al. (2016). An Operational Framework for Insecticide Resistance Management Planning. Emerging Infectious Diseases, 22, 773-779.
https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4861508/
[5]  Community Tool Box (2018). Developing a Management Plan.
https://www.ctb.ku.edu
[6]  Engels, J. (2017). What Are Tailings?—Their Nature and Production.
http://www.tailings.info/basics/tailings.htm
[7]  Ghana Minerals Commission (2012). Minerals and Mining (Health, Safety and Technical) Regulations, 2012. GPCL/A648/350/09/2012. Accra: Ghana Publishing Company Ltd, Assembly Press.
http://extwprlegs1.fao.org/docs/pdf/gha168930.pdf
[8]  Haigen, L., & Longzong, Y. (1997). Primary Design for Eassse Gold Mine of Sian Goldfields Limited, Ghana (pp. 4-1-4-23). Lanzhou: Lanzhou Engineering and Research Institute for Non-Ferrous Metallurgy.
[9]  iEduNote (2021). Create Effective Plan in 8 Steps (Planning Process).
https://www.iedunote.com/create-effective-plan
[10]  Lewis, M. R. (2019). How to Write a Management Plan.
https://www.wikihow.com/Write-a-Management-Plan
[11]  Logsdon, M. J., Hagelstein, K., & Mudder, T. I. (1999). The Management of Cyanide in Gold Extraction (pp. 19-31). Ottawa: International Council on Metals and the Environment.
http://www.icme.com
[12]  Misra et al. (2003). Cyanide Detoxification Process.
https://patentimages.storage.googleapis.com/19/d7/11/f37de07a9833f6/US6551514.pdf
[13]  Mullane, T. (2015). The Basic Steps in the Management Planning Process.
https://www.linkedin.com/pulse/basic-steps-management-planning-process-terry-mullane/
[14]  Northern Sydney Institute (2016). Manage Operational Plan: Develop Operational Plan Learning Guide.
https://nsfsakai.nthsydney.tafensw.edu.au/access/content/group/0f4ea869-0e76-4936-b16e-7407f58a3a5d/ManagementAndSmallBusiness/Manage%20Operational%20Plan/documents/ bsbmgt517_learning_guide_topic_1_v1_36.pdf
[15]  Olusanya, S. O., Awotungase, S. A., & Ohadebere, E. C. (2012). Effective Planning and Organisational Productivity. (A Case Study of Sterling Bank Nigeria Plc). IOSR Journal of Humanities and Social Science, 5, 31-39.
http://www.iosrjournals.org/iosr-jhss/papers/Vol5-issue5/D0553139.pdf
https://doi.org/10.9790/0837-0553139
[16]  Smith, T. (2019). Qualitative Analysis. Fundamental Analysis.
https://www.investopedia.com/terms/q/qualitativeanalysis.asp
[17]  Timmerman, J. (2019). Key Elements to a Successful Outsourcing Experience.
https://www.devsutd.com/key-elements-to-a-successful-outsourcing-experience/
[18]  Yeboah, O., & Arthur, S. (2017). Expressing Efficiency as a Function of Key Performance Control Parameters: A Case Study of Hydrocyclone Unit Process at Josay Goldfields Limited, Tarkwa, Ghana. Open Journal of Business and Management, 5, 476-486.
https://www.scirp.org/journal/paperinformation.aspx?paperid=77540
https://doi.org/10.4236/ojbm.2017.53041

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133