CPR1000核电厂电动主给水泵中联管振动研究
Study on Vibration of Coupling Pipe in Electric Main Feed Water Pump of CPR1000 Nuclear Power Plant

DOI: 10.12677/NST.2020.84024, PP. 203-215

Keywords: 主给水泵,时程分析,振动
Electric Feed Pump
, Time History Analysis, Vibration

Full-Text   Cite this paper   Add to My Lib

Abstract:

针对CPR1000核电厂电动主给水泵系统中联管振动高导致管道支架断裂问题,研究一系列极端运行工况下中联管的压力波瞬态变化,并通过时程分析方法计算中联管相应位置的振动频率和振动位移。根据通用一维管网水力软件和一维管网结构应力软件进行数值计算结果,提出优化中联管支架的方法,缓解中联管的振动效应,降低管道瞬态应力,避免管道或管道支架再次出现断裂现象。
In order to solve the problem of pipe support fracture caused by high vibration in the main electric feed water pump system of CPR1000 Nuclear Power Plant, the transient changes of pressure wave in the intermediate pipe under a series of extreme operating conditions were studied, and the vibration frequency and vibration displacement of the corresponding position of the intermediate pipe were calculated by time history analysis method. According to the numerical calculation results of the general one-dimensional pipe network hydraulic software and one-dimensional pipe network structure stress software, the method of optimizing the intermediate pipe support is proposed, which can alleviate the vibration effect of the intermediate pipe and reduce the transient stress, to avoid the fracture phenomenon of the pipe or pipe support.

References

[1]  胡晓阳. 基于Flowmaster的泵站系统水力过渡过程研究[D]: [硕士学位论文]. 成都: 西华大学, 2012.
[2]  张正楼, 张献娟, 刘玉璐. 基于Flowmaster的核电站循环冷却水系统泵出口阀关闭规律优化研究[J]. 给水排水, 2015, 51(2): 121-124.
[3]  杨勇, 沈良洁. 常规岛给水系统瞬态分析研究[J]. 产业与科技论坛, 2017, 16(18): 49-52.
[4]  王鑫, 韩伟实. 压水堆核电厂主给水管道水锤计算及分析[J]. 原子能科学技术, 2010, 44(S1): 192-197.
[5]  赵嘉明. 核动力装置一回路水锤研究及仿真计算[D]: [硕士学位论文]. 哈尔滨: 哈尔滨工程大学, 2008.
[6]  孔祥永, 赖诚, 白金川, 刘玉紫, 徐樟楠, 袁亮. CPR1000核电厂凝结水系统管道水锤效应研究[J]. 核科学与技术, 2018, 6(4): 124-131.
[7]  苏林森, 杨辉玉, 等. 900MW压水堆核电站系统与设备[M]. 深圳: 广东核电培训中心, 2000.