全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
-  2019 

Retrofitting of 245 kV OIP bushing with longer oil-end

Keywords: turret, OIP bushing, draw lead

Full-Text   Cite this paper   Add to My Lib

Abstract:

Sa?etak This article focuses on an original case-history of replacement of a leaky 245 kV OIP bushing of a 220/132/33 kV, 160 MVA, transformer on site at the 220 kV Jabalpur substation, in Madhya Pradesh state in India with an available 245 kV OIP bushing having longer L-2, Fig. 1. To retrofit the same turret-adopter, an extension piece was fabricated, with an innovative idea of utilizing locally available materials and in-house resources in minimum downtime on site, without re-locating or dismantling the transformer, thus giving the transmission and the distribution utilities tangible advantages such as large savings of revenue by way of dismantling transportation of the transformer to the OEM’s works for its repairs; repair charges, post-repair transportation to the site followed by erection and commissioning of the transformer on the site etc. and also avoiding dissatisfaction amongst all categories of consumers at large

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133