全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
-  2018 

A hybrid multi

DOI: 10.1177/1687814018765535

Keywords: Blocking flow shop,fuzzy scheduling problem,multi-objective optimization,gray wolf optimization,fuzzy processing time,fuzzy due date

Full-Text   Cite this paper   Add to My Lib

Abstract:

Blocking flow shop scheduling problems have important applications in manufacturing. Because of the imprecise and vague temporal parameters in real-world production, this article formulates a fuzzy blocking flow shop scheduling problem with fuzzy processing time and fuzzy due date in order to minimize the fuzzy makespan and maximize the average agreement index. To solve this combinational optimization problem, a hybrid multi-objective gray wolf optimization algorithm is proposed. The hybrid multi-objective gray wolf optimization utilizes the largest position value rule for solution representation, employs a dynamic maintenance strategy to maintain an archive, and develops a thorough mechanism for leader selection. In the hybrid multi-objective gray wolf optimization, a novel heuristic process is designed to generate initial solutions with a certain quality, and a local search strategy is embedded to improve the exploitation capability. The performance of the hybrid multi-objective gray wolf optimization is tested on the production instances of panel block assembly in shipbuilding. Computational comparisons of the hybrid multi-objective gray wolf optimization with two other well-known multi-objective evolutionary algorithms demonstrate the feasibility and effectiveness of the hybrid multi-objective gray wolf optimization in generating optimal solutions to the bi-criterion fuzzy blocking flow shop scheduling problem

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133