- 2008
紧凑型锅炉调试运行中存在的问题分析及对策Keywords: 紧凑型,CFB锅炉,调试 compact,CFB boiler,debugging Abstract: 针对茂名石化煤代油技改项目2×410 t/h CFB锅炉调试运行过程中出现的一系列问题,经过分析及计算,提出解决方法并取得了较好效果,为两台CFB锅炉实现长周期安全稳定运行打下了良好基础。 The project 2×410t/h of Coal instead of oil in Maoming Petrochemical Corporation had came out a series of problems in the running process of commissioning.Through analysis and calculation,the solution achieved good results,it had laid a good foundation to the two CFB boiler could operate long、 safe and stable
|