浅谈岱庄煤矿热电厂热工自动化系统的应用Keywords: 显示,调节,操作,自动化 display, adjustment, operation, automatic Abstract: 岱庄煤矿热电厂热工自动化系统于2 0 0 1年 2月 12日开始施工 ,于 2 0 0 1年 7月 2日竣工并投入使用。自投运以来 ,运行稳定、工作可靠 ,为岱庄煤矿热电厂的安全经济运行提供了可靠的保证 The heat power engineering automatic system begins to install in Feb. 21 2001 and put into operation in July 2 2001. After putting into operation the result is shown that, work condition is stability and reliable. It provides a guarantee for operation at safety and economic condition
|