全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
-  2019 

New Constraints on the Main Mineralization Event Inferred from the Latest Discoveries in the Bor Metallogenetic Zone (BMZ, East Serbia)

DOI: https://doi.org/10.3390/min9110672

Full-Text   Cite this paper   Add to My Lib

Abstract:

This study aims at better constraining the link between magmatism and metallogeny in the south-easternmost sector of the Bor Metallogenetic Zone (BMZ), where the world-class copper and gold deposit of ?ukaru Peki was recently discovered. The obtained U/Pb zircon ages confirm the earlier knowledge that the major Cu–Au porphyry and epithermal mineralization in the BMZ is genetically related to the first volcanic phase (‘Timok andesite’; 85–90 Ma). However, the data also suggest that during this phase, two subgroups of andesite porphyry were formed; they are named volcanic phase 1A (V1A) and volcanic phase 1B (V1B). The V1A andesite (89–90 Ma) is plagioclase-hornblende phyric, holocrystalline and ubiquitously hydrothermally altered and/or mineralized, whereas the V1B (85–86 Ma) is hornblende-plagioclase phyric, holo- to hypocrystalline, fresh, and non-mineralized. According to our simplified model, the contrasting productivity of the V1A and V1B is explained by fluctuations during AFC (assimilation-fractional crystallization) processes of water-rich parental magma, which have controlled the order of crystallization of hornblende and plagioclase in the V1A and V1B andesite. View Full-Tex

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133