全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Optimization of Scheduling in Ethanol Production from Oil Palm Empty Fruit Bunch Process

DOI: 10.24203/ajas.v6i6.5584

Keywords: [Ethanol Production, Scheduling Batch Process, Empty Fruit Bunch, Aspen Batch Process Developer]

Full-Text   Cite this paper   Add to My Lib

Abstract:

In this research, the scheduling Batch process had done for minimizing the processing time and the highest equipment efficiency of the ethanol production process. Aspen Plus program was used to perform the mass and balances in the steady state part, and Aspen Batch Process Developer program was used to schedule batch parts of the process. The production process from oil palm empty fruit bunch has the ethanol capacity of 9,200 kg per day. The raw materials are oil palm empty fruit bunch 47,000 kg per day. There are four production schedules: one hydrolysis tank and one fermentation tank, four hydrolysis tanks and a fermentation tank, one hydrolysis tank and four fermentation tanks, four tanks of hydrolysis and four tanks of fermentation. This can reduce time consumption in one production cycle and less cycle tim

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133