带电分闸220 V空载电缆的电弧电流暂态仿真研究
Arc Current Transient Simulation of Live Breaking 220 V Non-Loaded Cables

DOI: 10.12677/TDET.2020.91002, PP. 8-17

Keywords: 带电分闸,220 V空载电缆,电弧黑盒模型,电弧电流
Live Breaking
, 220 V Non-Loaded Cables, Arc Black-Box Model, Arc Current

Full-Text   Cite this paper   Add to My Lib

Abstract:

为了研究带电分闸220 V空载电缆时断口产生电弧的暂态过程及其影响因素,本文首先建立了改进的电弧黑盒模型,在该模型的基础上,采用ATP?EMTP软件搭建了带电分闸220 V空载电缆仿真电路,研究了分闸初相角、电缆长度、导体层半径改变对电弧电流暂态过程的影响,仿真结果表明:电缆长度越长、导体层半径越大,分闸操作产生的电弧电流越大,而分闸初相角变化对电弧电流基本没有影响。通过本文的仿真研究,能够为带电分闸220 V电压等级的空载电缆线路提供一定的理论指导。
In order to study the transient process and influencing factors of electric arc produced by live breaking 220 V non-loaded cables, an improved arc black-box model is established in this paper. On the basis of this model, the simulation circuit of live breaking 220 V non-loaded cables is built by using ATP-EMTP software. The influence of the change of the opening initial phase angle, cable length and conductor layer radius on the transient process of electric arc current is studied. The simulation results show that the longer the cable length and the larger the radius of the conductor layer, the greater the arc current generated by the opening operation, and the change of the opening initial phase angle basically has no effect on the arc current. Through the simulation research in this paper, it can provide some theoretical guidance for live breaking the non-loaded cables with the voltage level of 220 V.

References

[1]  闫格, 吴细秀, 田芸, 等. 开关电弧放电电磁暂态干扰研究综述[J]. 高压电器, 2014, 50(2): 119-130.
[2]  舒胜文, 黄道春, 阮江军. 真空开关电弧开断过程的数值仿真方法研究进展[J]. 高压电器, 2014, 50(2): 131-138.
[3]  林莘, 王亮, 徐建源, 等. 非平衡态双温度SF6离子体电弧数学模型研究[J]. 高压电器, 2015, 51(3): 1-7.
[4]  王晓远, 高淼, 赵玉双. 阻性负载下低压故障电弧特性分析[J]. 电力自动化设备, 2015, 35(5): 106-110.
[5]  荣命哲, 杨飞, 吴翊, 等. 直流断路器电弧研究的新进展[J]. 电工技术学报, 2014, 29(1): 1-9.
[6]  Lin, X., Wang, N. and Xu, J.Y. (2012) Calculation and Analysis of Very Fast Transient Over-Voltage Characteristic on the Condition of Dynamic Arcing Model. Proceedings of the CSEE, 32, 157-164.
[7]  Ji, L., Chen, D.G., Liu, Y.Y., et al. (2009) Simulation of the Interruption Process of Low Voltage Circuit Breaker Using Dynamic Mathematic Arc Model. Proceedings of the CSEE, 29, 107-113.
[8]  Wang, Z.X., Geng, Y.S. and Liu, Z.Y. (2012) Step Wise Behavior of Free Recovery Processes after Diffused Vacuum Arc Extinction. IEEE Transactions on Dielectrics and Electrical Insulation, 19, 582-590.
https://doi.org/10.1109/TDEI.2012.6180253
[9]  许晔, 郭谋发, 陈彬, 等. 配电网单相接地建模仿真分析研究[J]. 电力系统保护与控制, 2015(7): 57-64.
[10]  曹珍崇, 杨学昌, 郅啸, 等. 电缆配电网操作过电压的计算与分析[J]. 清华大学学报(自然科学版), 2007, 47(4): 466?469.
[11]  郑传广, 刘凯, 刘庭, 等. 10 kV配电线路旁路作业电磁暂态过程仿真计算研究[J]. 电工电气, 2013(3): 7-12.
[12]  王建军, 吴季浩, 苏梓铭. 10 kV电缆终端带电作业仿真及试验研究[J]. 电力建设, 2014, 35(2): 41-46.
[13]  王广利, 吴爱军, 陈宇. 拆, 搭电缆引线时电弧建模仿真研究及消弧策略优化[J]. 华东电力, 2012, 40(12): 2299-2302.
[14]  赵玉林. 高电压技术[M]. 北京: 中国电力出版社, 2009.
[15]  Wu, X.X., Li, Z.B., Tian, Y., et al. (2011) Investigate on the Simulation of Black-Box Arc Model. 2011 1st International Conference on Electric Power Equipment-Switching Technology, Xi’an, 23-27 October 2011, 629-636.
[16]  Smeets, R.P.P. and Kertesz, V. (2000) Evaluation of High-Voltage Circuit Breaker Performance with a Validated Arc Model. IEE Proceedings of the Generation, Transmission and Distribution, 147, 121-125.
https://doi.org/10.1049/ip-gtd:20000238

Full-Text