海底PLEM吸力桩式基础施工技术——以安哥拉渔港油库扩建项目CBM (多点系泊)工程为例
The Construction Technology for Submarine PLEM Suction Pile Foundation——By Taking the CBM (Multi-point Mooring) Project of the Angolan Fishing Port Oil Depot Expansion Project for Example

DOI: 10.12677/JOGT.2019.412020, PP. 45-49

Keywords: 海底PLEM,吸力桩,气举法
Submarine PLEM
, Suction Pile, Air Lift Method

Full-Text   Cite this paper   Add to My Lib

Abstract:

海底PLEM吸力桩式基础施工技术具有施工设备简单、施工周期短等特点,适用于海底松软的地基处理。阐述了吸力桩的安装原理,以工程实践为例介绍了气举法安装海底PLEM吸力桩式基础的应用。
The construction technology of submarine PLEM suction pile foundation had the characteristics of simple construction equipment and short construction period, and was suitable for foundation treatment under soft geological conditions on the seabed. The installation principle of suction piles is expounded. By taking a project practice as an example, the application of air lift method is introduced for the submarine PLEM suction pile foundation construction technology.

References

[1]  Tjelta, T.I. (2001) Suction Piles: Their Position and Application Today. International Society of Offshore and Polar Engineers, 6, 17-22.
[2]  王丽勤, 庞然. 吸力式基础在深水油气田开发中的应用探讨[J]. 船海工程, 2011, 40(2): 98-103.
[3]  王丽勤, 侯金林, 庞然, 等. 深水油气田开发工程中的基础应用探讨[J]. 海洋石油, 2011, 31(4): 87-92.