考虑回水效应的一库多级式水电站群短期优化调度模型
A Short-Term Optimal Scheduling Model of Cascaded Hydropower Stations with One Reservoir Considering the Effect of Backwater

DOI: 10.12677/JWRR.2019.83030, PP. 248-259

Keywords: 一库多级,回水效应,混合整数线性规划
Cascaded Hydropower Stations with One Reservoir
, Backwater, MILP

Full-Text   Cite this paper   Add to My Lib

Abstract:

“一库多级”梯级水电站间水力联系紧密,下库易产生回水对上库尾水位形成顶托作用,影响发电效率及计划安排。本文以机组为基本调度单元,提出了考虑回水效应的“一库多级”式水电站群短期优化调度模型,通过对下游库水位进行区间划分,将尾水位–泄量–库水位三维曲线描述为三种典型情境,采用分段线性方法实现了线性描述,最终将原问题转换为混合整数线性规划模型,并利用商用软件Lingo进行求解。经红水河干流天生桥梯级水电站群实例验证,提出的模型可在充分考虑回水影响下实现水电站群的精细化计算,有效提高梯级水电站群的发电量。
The hydraulic coupling among cascaded hydropower stations with one reservoir is close, and the backwater from the downstream reservoir is easy to form a jacking effect on the tailwater level of the upstream reservoir, which affects the generation efficiency and planning. Based on the unit of the basic dispatching unit, this paper puts forward a short-term optimal scheduling model of cascaded hydropower stations with one reservoir, which takes the effect of backwater into consideration. Through the interval division of the downstream reservoir water level, the three-dimensional curve of tailwater level-discharge-reservoir water level is described as three typical scenarios, and the linear description is realized by piecewise linear method. The developed model converts into a mixed integer linear programming model, which can be solved by commercial software Lingo. Based on a case study with Tianshengqiao cascaded hydropower stations located in Hongshui River, the study shows that the proposed model considering backwater effect can realize the refined calculation and improve the economic benefits of scheduling.

References

[1]  CHENG, C., YAN, L., MIRCHI, A., et al. China’s booming hydropower: Systems modeling challenges and opportunities. Journal of Water Resources Planning and Management, 2016, 143(1): 02516002.
https://doi.org/10.1061/(ASCE)WR.1943-5452.0000723
[2]  申建建, 张楠男, 程春田, 等. 基于聚类分析和决策树的“一库多级”水电站日调度方法[J]. 中国电机工程学报, 2019, 39(3): 652-663+945. SHEN Jianjian, ZHANG Nannan, CHENG Chuntian, et al. Method for daily operation of hydropower stations with one reservoir based on cluster analysis and decision tree technique. Proceedings of the CSEE, 2019, 39(3): 652-663+945. (in Chinese)
[3]  WANG, J. Short-term generation scheduling model of Fujian hydro system. Energy Conversion and Management, 2009, 50(4): 1085-1094.
https://doi.org/10.1016/j.enconman.2008.12.004
[4]  申建建, 程春田, 李卫东, 等. 复杂时段耦合型约束水电站群短期变尺度优化调度方法[J]. 中国电机工程学报, 2014, 34(1): 87-95. SHEN Jianjian, CHENG Chuntian, LI Weidong, et al. A mutative-scale optimization method for short-term operation of hydropower plants with complex temporal coupling constraints. Proceedings of the CSEE, 2014, 34(1): 87-95. (in Chinese)
[5]  李义, 李承军, 周建中. POA-DPSA混合算法在短期优化调度中的应用[J]. 水电能源科学, 2004, 22(1): 37-39. LI Yi, LI Chengjun and ZHOU Jianzhong. POA-DPSA algorithm for short-term hydro scheduling of cascaded hydroelectric stations. Water Resources and Power, 2004, 22(1): 37-39. (in Chinese)
[6]  JI, C., YU, H., WU, J., et al. Research on cascade reservoirs’ short-term optimal operation under the effect of reverse regulation. Water, 2018, 10(6): 808.
https://doi.org/10.3390/w10060808
[7]  苏承国, 王沛霖, 武新宇, 等. 考虑机组组合的梯级水电站短期调峰MILP模型[J]. 电网技术, 2018, 42(6): 1883-1891. SU Chengguo, WANG Peilin, WU Xinyu, et al. A compact MILP model for short-term peak shaving of cascaded hydropower plants considering unit commitment. Power System Technology, 2018, 42(6): 1883-1891. (in Chinese)
[8]  徐鼎甲. 进行日调节时水电站下游水位的计算[J]. 水利水电技术, 1995(4): 2-4. XU Dingjia. Calculation of downstream water level of hydropower station during daily regulation. Water Resources and Hydropower Engineering, 1995(4): 2-4. (in Chinese)
[9]  LIU, B., CHENG, C., WANG, S., et al. Parallel chance-constrained dynamic programming for cascade hydropower system operation. Energy, 2018, 165: 752-767.
https://doi.org/10.1016/j.energy.2018.09.140
[10]  纪昌明, 马皓宇, 李传刚, 等. 基于可行域搜索映射的并行动态规划[J]. 水利学报, 2018, 49(6): 649-661. JI Changming, MA Haoyu, LI Chuangang, et al. Research on parallel dynamic programming based on feasible region search mapping. Journal of Hydraulic Engineering, 2018, 49(6): 649-661. (in Chinese)
[11]  梅亚东. 梯级水库优化调度的有后效性动态规划模型及应用[J]. 水科学进展, 2000, 11(2): 194-198. MEI Yadong. Dynamic programming model without markovin property of cascade reservoirs operation and its application. Advances in Water Science, 2000, 11(2): 194-198. (in Chinese)
[12]  CATALAO, J. P. S., MARIANO, S. J. P. S., MENDES, V. M. F., et al. Scheduling of head-sensitive cascaded hydro systems: A nonlinear approach. IEEE Transactions on Power Systems, 2009, 24(1): 337-346.
https://doi.org/10.1109/TPWRS.2008.2005708
[13]  BORGHETTI, A., et al. An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir. IEEE Transactions on Power Systems, 2008, 23(3): 1115-1124.
https://doi.org/10.1109/TPWRS.2008.926704
[14]  CHENG, C., WANG, J. and WU, X. Hydro unit commitment with a head-sensitive reservoir and multiple vibration zones using MILP. IEEE Transactions on Power Systems, 2016, 31: 4842-4852.
https://doi.org/10.1109/TPWRS.2016.2522469
[15]  GE, X. L., ZHANG, L. Z., SHU, J., et al. Short-term hydropower optimal scheduling considering the optimization of water time delay. Electric Power Systems Research, 2014, 110: 188-197.
https://doi.org/10.1016/j.epsr.2014.01.015