全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

丹江河谷区铁路空间综合地质选线
Spatial Comprehensive Geological Route Selection of Railway in Danjiang River Valley

DOI: 10.12677/HJCE.2019.89156, PP. 1344-1348

Keywords: 宁西铁路,丹江河谷区,不良地质,第三系地层,综合勘察,地质选线
Xi’an-Nanjing Railway
, Danjiang River Valley, Unfavorable Geology, Tertiary Strata, Comprehensive Survey, The Geological Line Selection

Full-Text   Cite this paper   Add to My Lib

Abstract:

商州至丹凤段丹江河谷区,地质构造发育、两岸斜坡处滑坡、溜坍等不良地质广泛分布、水文地质条件复杂,第三系地层工程性质差。为研究宁西铁路在商州至丹凤段丹江河谷区线路方案,通过在大面积地质调绘基础上,采用遥感技术与钻探、物探、室内试验相结合的地质综合勘察手段,查明了该区域的地质构造、地层岩性特征、两岸斜坡处滑坡、溜坍等不良地质分布、地下水发育情况等工程地质及水文地质条件,重点对丹江两岸滑坡、溜坍等斜坡稳定性进行了准确的分析评价,同时对第三系地层的工程性质进行了工程适应性综合分析研究,形成了丹江河谷区地质选线的新思路,提出了地质选线的具体原则:线路方案宜尽量少通过斜坡段落,并且宜少以隧道方式通过第三系地层。
In the Danjiang River valley area of Shangzhou-Danfeng section, the geological structure is developed, unfavorable geology such as landslide and slump at the slopes on both sides of the bank is widely distributed, hydrogeological conditions are complex, and the engineering properties of Tertiary strata are poor. In order to study the route scheme of Xi’an-Nanjing Railway in the Danjiang River valley area of Shangzhou-Danfeng section, based on large-area geological mapping, the engineering geological and hydrogeological conditions such as geological structure, stratigraphic lithologic characteristics, unfavorable geological distribution such as landslide and slump at the slopes on both sides of the bank, groundwater development, etc. in the area were found out by using remote sensing technology combined with geological comprehensive investigation methods such as drilling, geophysical exploration and laboratory tests. The stability of slopes on both sides of the Danjiang River, such as landslides and slumps, has been analyzed and evaluated accurately. At the same time, the engineering adaptability of Tertiary strata has been comprehensively analyzed and studied. A new idea of geological route selection in the Danjiang River valley has been formed. The specific principles of geological route selection have been put forward: the route scheme should pass through the slope sections as few as possible, and the Tertiary strata should pass through tunnels as few as possible.

References

[1]  徐正宣, 等. 成都至都江堰铁路工程地质勘察[J]. 铁道标准设计, 2014(s): 009-013.
[2]  王朋. 某既有铁路地质灾害及路基病害发育分布规律[J]. 建筑工程技术与设计, 2016(2): 56-62.
[3]  改建建宁西铁路可行性研究报告[R]. 西安: 中铁第一勘察设计院集团有限公司, 2009.
[4]  黄启迪. 铁路隧道风险管理与评估[D]: [硕士学位论文]. 北京: 北京交通大学, 2011.
[5]  徐碎安, 等. 旋挖钻在卵石、泥岩地质条件下钻孔灌注桩施工[J]. 科技咨询导报, 2007(3): 21-25.
[6]  甄秉国. 兰渝铁路特殊复杂地质环境及特征研究[J]. 铁道标准设计, 2013(4): 001-04.
[7]  王建鹏. 北秦岭南缘中低山区地质选线[J]. 铁路地质与路基, 2003(6): 12-16.
[8]  改建建宁西铁路可行性研究报告第四篇(地质)[R]. 西安: 中铁第一勘察设计院集团有限公司, 2009.
[9]  李建强. 成都地铁岩土工程勘察[J]. 隧道建设, 2007(9): 16-21.
[10]  李善俊. 地质选线对铁路主体工程的影响与评价[J]. 科学时代, 2014(1): 52-57.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133