Since the hidden costs of construction projects are subtle and strong, difficult to quantify, it has not yet resulted in completing research system. This paper analyzes the literature to identify the concepts and forms of hidden costs, then summarizes the factors affecting the construction of 20 projects in hidden costs. Factor analysis extracted six comprehensive factor variables to represent the most influential factors, propose appropriate measures to control construction projects of hidden costs, and lay the foundation for further quantifying the hidden costs for these factors.
References
[1]
Yang, J.L. (2008) Research on Hidden Cost Control of Construction Enterprise Projects. Beijing JiaoTong University, Beijing.
[2]
Gu, T.Y. (2011) Research on the Influencing Factors and Control Strategies of Hidden Costs in the Construction Phase of Construction Projects. Xi’an University of Architecture and Technology, Xi’an.
[3]
Sun, C.L., Song, H., Yan, X.F., et al. (2013) Construction of the Construction Project Manager’s Ability Index System. Forecast, 1, 72-76.
[4]
Du, Y.B. (2009) Research on Performance Evaluation of China’s Real Estate Listed Companies Based on Factor Analysis. Chongqing University, Chongqing.
[5]
Zhang, W.Z. and Zhong, Y.F. (2013) IBM SPSS Data Analysis and Mining Case Study Essence. Tsinghua University Press, Beijing, 229-232.
[6]
Sun, X. (2009) An Application of Factor Analysis Method in Life Quality Assessment of Urban Residents in Jiangsu Province. Nanjing University of Aeronautics and Astronautics, Nan-jing.
[7]
Zhang, S.L. and Li, P. (2011) An Empirical Study on Risk Factors of Architectural Engineering Design Based on Factor Analysis. China Safety Science Journal, 3, 131-138.
[8]
Reise, S.P., Waller, N.G. and Comery, A.L. (2000) Factor Analysis and Scale Revision. Psychological Assessment, 12, 287-297. https://doi.org/10.1037/1040-3590.12.3.287