Abstract:
农村现有的10 kV配电变压器由于老化问题已经难以满足逐年增长的用电需求,变压器更换已成为农村配网改造中亟待解决的重要问题。为此,提出了一种基于全寿命周期成本与风险分析的老化变压器更换决策新方法。该方法在分析变压器全寿命周期各项成本的基础上,综合考虑服役时间、供电可靠率、重载负荷等因素对变压器经济寿命的影响,并结合投资风险评估思想安排老化变压器的更换次序,弥补了传统决策方法中仅以服役时间作为主要投资依据的不足。以陕西南部地区某农村配网中9台变压器的更换为例进行了计算,结果表明:所提方法能够在变压器更换方案中反映低供电可靠率、重载负荷对变压器经济寿命的负面影响,较仅以服役时间为依据的传统方法更为科学有效;此外,采用文中提出的变压器更换投资决策方法减少了2.93%的更换成本,显著提高了变压器更换投资的经济效益,能够为农村配电变压器的投资规划提供参考。
The current 10 kV distribution transformers in rural area can hardly satisfy the gradually increasing power demand due to the aging??failure. Facing this challenge, a novel decision approach for the replacement of aged transformers is developed with life cycle cost theory and risk assessment. The proposed approach considers the impacts of operating time, supply reliability and heavy load to transformer economic life, which remedies the limitation of the conventional approach. Furthermore, the methodology based on risk assessment is also utilized in the final investment strategy. A replacement order for nine aged transformers of a rural distribution network in southern Shaanxi is arranged. The numerical results indicate that the proposed approach enables to make a more reasonable investment decision and to reflect the adverse impacts of poor reliability and heavy load on the economic life of transformers. This approach improves the cost??effectiveness of transformer replacement by reducing 2.93% of the total cost
[1] | [1]史京楠, 韩红丽, 徐涛. 全寿命周期成本分析在变电工程规划设计中的应用 [J]. 电网技术, 2009, 33(9): 63??66. |
[2] | [2]郝洵. 基于全寿命周期成本的变压器技改经济评估 [D]. 武汉: 华中科技大学, 2011. |
[3] | [3]马骏, 韩天祥, 姚明, 等. 泰和变电站220kV GIS设备改造LCC计算后评估研究 [J]. 华东电力, 2005, 22(12): 15??19. |
[4] | MA Jun, HAN Tianxiang, YAO Ming, et al. Expost evaluation on LCC calculation for Taihe substation 220 kV GIS retrofit [J]. East China Electric Power, 2005, 22(12): 15??19. |
[5] | [6]王建. 全寿命周期成本理论在电力设备投资决策中的应用研究 [D]. 重庆: 重庆大学, 2008. |
[6] | [7]李涛, 马薇, 黄晓蓓. 基于全寿命周期成本理论的变电设备管理 [J]. 电网技术, 2008, 32(11): 50??53. |
[7] | SHI Jingnan, HAN Hongli, XU Tao. Application of life cycle cost analysis in planning design of power transformation projects [J]. Power System Technology, 2009, 33(9): 63??66. |
[8] | TENG Letian, LI Li, HAN Tianxiang. Discussion and practice of reliability management with LCC theory [J]. Shanghai Power, 2005(1): 65??67. |
[9] | XIA Chengjun, QIU Guihua, HUANG Dongyan, et al. Life cycle cost model and sensitivity analysis of power transformer [J]. East China Electric Power, 2012, 40(1): 26??30. |
[10] | [15]张翔, 宋子彤, 杨致慧, 等. 一种基于负载率和设备检测信息的油浸式变压器故障率模型 [J]. 电网技术, 2013, 37(4): 1159??1165. |
[11] | ZHANG Xiang, SONG Zitong, YANG Zhihui, et al. A failure model for oil??immersed transformer based on load factor and equipment inspection information [J]. Power System Technology, 2013, 37(4): 1159??1165. |
[12] | [17]WANG Jianxue, LU Jianming, BIE Zhaohong, et al. Long??term maintenance scheduling of smart distribution system through a PSO??TS algorithm [J]. Journal of Applied Mathematics, 2014: 694086 [2015??01??02]. http:∥www.hindawi.com/journals/jam/2014/694086/ |
[13] | [19]任双赞, 钟力生, 于钦学, 等. 变压器油加速热老化过程中的多参量相关?不毓榉治? [J]. 西安交通大学学报, 2010, 44(10): 88??92. |
[14] | REN Shuangzan, ZHONG Lisheng, YU Qinxue, et al. Multi??parameter correlation??regression analysis for transformer oil under accelerating thermal aging [J]. Journal of Xi’an Jiaotong University, 2010, 44(10): 88??92. |
[15] | CHEN Shumin, SHI Yumei. Brief introduction of transformer and its cooling modes [J]. Transformer, 2010, 47(4): 50??53. |
[16] | [22]LI Wenyuan, CHOUDHURY P. Probabilistic transmission planning [J]. Power and Energy Magazine, 2007, 5(5): 46??53. |
[17] | [4]梅志农, 袁思吟, 韩天祥, 等. 上海世博变电站工程中的LCC实践 [J]. 上海电力, 2009(3): 242??245. |
[18] | MEI Zhinong, YUAN Siyin, HAN Tianxiang, et al. Practice of LCC theory at Shanghai World Expo substation [J]. Shanghai Power, 2009(3): 242??245. |
[19] | [5]滕乐天, 李力, 韩天祥. 以LCC理念进行可靠性管理的探讨与实践 [J]. 上海电力, 2005(1): 65??67. |
[20] | [10]刘有为, 马麟, 吴立远, 等. 电力变压器经济寿命模型及应用实例 [J]. 电网技术, 2012, 36(10): 235??240. |
[21] | HUANG Chenhong. Technical and economic analysis of replacing Shanghai power grid high??energy??consumption transformers [J]. Power Demand Side Management, 2010(1): 53??56. |
[22] | [12]冯长有, 王锡凡, 别朝红, 等. 基于系统可靠性评估的机组检修规划模型 [J]. 西安交通大学学报, 2009, 43(8): 80??84, 106. |
[23] | [14]翟博龙, 黄绪勇, 孙鹏, 等. 基于可靠度的电力变压器寿命分析 [J]. 电网技术, 2011, 35(5): 127??131. |
[24] | ZHAI Bolong, HUANG Xuyong, SUN Peng, et al. Service life analysis of power transformer based on reliability [J]. Power System Technology, 2011, 35(5): 127??131. |
[25] | [16]FENG Changyou, WANG Xifan. A competitive mechanism of unit maintenance scheduling in a deregulated environment [J]. IEEE Transactions on Power Systems, 2010, 25(1): 351??359. |
[26] | [18]WOUTERS P A A F, VAN SCHIJNDEL A, WETZER J M. Remaining lifetime modeling of power transformers: individual assets and fleets [J]. Electrical Insulation Magazine, 2011, 27(3): 45??51. |
[27] | [20]陈书敏, 石玉美. 变压器及其冷却方式简介 [J]. 变压器, 2010, 47(4): 50??53. |
[28] | LI Tao, MA Wei, HUANG Xiaopei. Power transformation equipment management based on life cycle cost theory [J]. Power System Technology, 2008, 32(11): 50??53. |
[29] | [8]夏成军, 邱桂华, 黄冬燕, 等. 电力变压器全寿命周期成本模型及灵敏度分析 [J]. 华东电力, 2012, 40(1): 26??30. |
[30] | [9]王成福. 变压器经济寿命评估及经济运行方式优选的方法研究 [D]. 哈尔滨: 哈尔滨工业大学, 2008. |
[31] | LIU Youwei, MA Lin, WU Liyuan, et al. Economic life model of power transformer and its application [J]. Power System Technology, 2012, 36(10): 235??240. |
[32] | [11]黄晨宏. 上海电网更换高能耗变压器的技术经济性分析 [J]. 电力需求侧管理, 2010(1): 53??56. |
[33] | FENG Changyou, WANG Xifan, BIE Zhaohong, et al. Unit maintenance scheduling model based on system reliability [J]. Journal of Xi’an Jiaotong University, 2009, 43(8): 80??84, 106. |
[34] | [13]罗晓初, 李乐, 魏志连, 等. 全寿命周期成本理论在配电变压器改造投资决策中的应用 [J]. 电网技术, 2011, 35(2): 207??211. |
[35] | LUO Xiaochu, LI Le, WEI Zhilian, et al. Applications of life cycle cost theory in decision??making of investment for distribution transformers renovation [J]. Power System Technology, 2011, 35(2): 207??211. |
[36] | [21]熊信银, 律方成, 李永刚, 等. 发电厂电气部分 [M]. 北京: 中国电力出版社, 2009: 323??324. |