Aaron T Wolf.Criteria for equitable allocations:The heart of international water conflict[J].Natural Resources Forum,1999,23(l):3-30.
[2]
Asit K Biswas.Management of international waters:opportunities and constraints[J].International Journal of Water Resources Development,1999,15(4):429-441.
[3]
Pech Sokhem,Kengo Sunada,Satoru Oishi.Managing transboundary rivers:The case of the Mekong River basin[J].Water International,2007,32:503-523.
[4]
Mirja Kattelus,Matti Kummu,Marko Keskinen,et al.China’s southbound transboundary river basins:A case of asymmetry[J].Water International,2015,40:113-138.
[5]
符传君.海南省水资源配置决策的层次分析模型研究[J].中国水利水电科学研究院学报,2007,5(5):212-217.Fu Chuanjun.Level analysis model of water resources allocation decision-making in Hainan province[J].Journal of China Institute of Water Resources and Hydropower Research,2007,5(5):212-217.
[6]
游进军,赵帆,杨聪,等.针对水资源配置评价的定量指标改进层次分析法研究[J].水利水电技术,2010,41(3):6-9.You Jinjun,Zhao Fan,Yang Cong,et al.An improved analytic hierarchy process(AHP)for the quantitative evaluation of water resources allocation[J].Water Resources and Hydropower Engineering,2010,41(3):6-9.
[7]
Bojan Srdjevic.Linking analytic hierarchy process and social choice methods to support group decision-making in water management[J].Decision Support Systems,2007,42:2261-2273.
[8]
Seemant Bhagabati,Akiyuki Kawasaki,Mukand Babel,et al.A cooperative game analysis of transboundary hydropower development in the lower Mekong:case of the 3Ssub-basins[J].Water Resources Management,2014,28:3417-3437.
[9]
陈海燕.可利用水量变化影响国际河流分水的实例及其启示[J].水利发展研究,2006,(7):53-56.Chen Haiyan.Example of available water changes affecting international river water allocation and its enlightenment[J].Water Resources Development Research,2006,(7):53-56.
[10]
何大明,汤奇成.中国国际河流[M].北京:科学出版社,2000.He Daming,Tang Qicheng.China International River[M].Beijing:Science Press,2000.
[11]
陈丽晖,何大明.澜沧江-湄公河整体水分配[J].经济地理,2001,21(1):28-32.Chen Lihui,He Daming.The whole water allocation of the Lancang-Mekong River[J].Economic Geography,2001,21(1):28-32.
[12]
Saaty T L.The Analytic Hierarchy Process:Planning,Priority Setting,Resource Allocation[M].McGraw-Hill,1980.