彭绍才,段国学,武方洁.三峡水轮机蜗壳充水加压过程应力分析[J].人民长江,2011,42(10):87-90.Peng Shaocai,Duan Guoxue,Wu Fangjie.Analysis of stress during water filling and pressure increasing process of turbine spiral casing of Three Gorges Power Plant[J].Yangtze River,2011,42(10):87-90.
[2]
陈琴,林绍忠,苏海东.大型机组直埋式蜗壳结构不同限裂措施的三维非线性分析[J].长江科学院院报,2008,25(6):101-105.Chen Qin,Lin Shaozhong,Su Haidong.Three-dimension nonlinear analysis on directly embedded spiral case of large-scale turbine unit with various measures of restricting cracks[J].Journal of Yangtze River Scientific Research Institute,2008,25(6):101-105.
[3]
袁达夫,谢红兵.大型混流式水轮机蜗壳的埋设方式[J].人民长江,2009,40(16):37-39.Yuan Dafu,Xie Hongbing.Embedding type of large mixed-flow turbine spiral case[J].Yangtze River,2009,40(16):37-39.
[4]
钮新强,谢红兵,刘志明.三峡右岸电站蜗壳直埋方案研究[J].人民长江,2008,39(1):1-2,12.Niu Xinqiang,Xie Hongbing,Liu Zhiming.Research on directly embedded spiral case scheme of Three Gorges right bank power station[J].Yangtze River,2008,39(1):1-2,12.
[5]
陈琴,林绍忠,张杰.三峡电站直埋式蜗壳结构试验模型的非线性有限元分析[J].长江科学院院报,2007,24(2):51-54.Chen Qin,Lin Shaozhong,Zhang Jie.Three-dimension nonlinear finite-element analysis on directly embedded spiral case model of TGP hydroelectric power plant[J].Journal of Yangtze River Scientific Research Institute,2007,24(2):51-54.
[6]
张运良,张存慧,马震岳.三峡水电站直埋式蜗壳结构的非线性分析[J].水利学报,2009,40(2):220-225.Zhang Yunliang,Zhang Cunhui,Ma Zhenyue.Nonlinear FEM analysis on stress and strain of directly-embedded large-scale spirals[J].Journal of Hydraulic Engineer,2009,40(2):220-225.
[7]
伍鹤皋,蒋逵超,申艳,等.直埋式蜗壳三维非线性有限元静力计算[J].水利学报,2006,37(11):1323-1328.Wu Hegao,Jiang Kuichao,Shen Yan,et al.Three-dimensional nonlinear finite element static calculation of complete bearing spiral case[J].Journal of Hydraulic Engineering,2006,37(10):1323-1328.
[8]
李丹,廖远志,张新宇,等.三峡右岸电站15号机组蜗壳采用直埋方案探讨[J].人民长江,2007,38(8):17-23.Li Dan,Liao Yuanzhi,Zhang Xinyu,et al.Discuss on directly embedded spiral case scheme of Three Gorges right bank power station unit No.15[J].Yangtze River,2007,38(8):17-23.
[9]
张杰,兰道银,何英杰.三峡电站机组蜗壳直埋方案仿真模型试验研究[J].长江科学院院报,2007,24(1):47-50.Zhang Jie,Lan Daoyin,He Yingjie.Experimental research on spiral case of Three Gorges Power Station’s unit with directly burying scheme[J].Journal of Yangtze River Scientific Research Institute,2007,24(1):47-50.
[10]
张运良,马震岳,程国瑞,等.水轮机蜗壳不同埋设方式的流道结构刚强度分析[J].水利学报,2006,37(10):1206-1211.Zhang Yunliang,Ma Zhenyue,Cheng Guorui,et al.Strength and stiffness analysis of spiral casing with different embedded manners[J].Journal of Hydraulic Engineer,2006,37(10):1206-1211.
[11]
陈琴,苏海东,崔建华,等.大型机组蜗壳不同埋设方式的结构开裂分析[J].长江科学院院报,2009,26(4):40-43.Chen Qin,Su Haidong,Cui Jianhua,et al.Crack analysis on spiral case structure of large-scale turbine units with different embedded manners[J].Journal of Yangtze River Scientific Research Institute,2009,26(4):40-43.
[12]
彭绍才,段国学,黎晶晶.三峡右岸电站机组蜗壳应力监测成果分析[J].人民长江,2009,40(23):78-80.Peng Shaocai,Duan Guoxue,Li Jingjing.Analysis on stress monitoring results of spiral case of Three Gorges right bank power station[J].Yangtze River,2009,40(23):78-80.