柳璐,王和杰,程浩忠,等.基于全寿命周期成本的电力系统经济性评估方法[J].电力系统自动化,2012,36(15):45-50.Liu Lu,Wang Hejie,Cheng Haozhong,et al.Economic evaluation of power systems based on life cycle cost[J].Automation of Electric Power Systems,2012,36(15):45-50.
[2]
穆永铮,鲁宗相,乔颖,等.基于多算子层次分析模糊评价的电网安全与效益综合评价指标体系[J].电网技术,2015,39(1):23-28.Mu Yongzheng,Lu Zongxiang,Qiao Ying,et al.A comprehensive evaluation index system of power grid security and benefit based on multi-operator fuzzy hierarchy evaluation method[J].Power System Technology,2015,39(1):23-28.
[3]
王鹤,曾鸣,陈珊,等.基于模糊层次分析法的供电服务质量综合评价模型[J].电网技术,2006,30(17):92-96.Wang He,Zeng Ming,Chen Shan,et al.Comprehensive evaluation model for power supply service quality based on fuzzy analytic hierarchy process[J].Power System Technology,2006,30(17):92-96.
[4]
王俊良,白慧芳,宋斌.基于层次分析的变压器故障诊断决策支持系统[J].武汉大学学报(工学版),2008,41(6):91-94.Wang Junliang,Bai Huifang,Song Bin.A fault diagnosis decision support system based on analytic hierarchy process[J].Engineering Journal of Wuhan University,2008,41(6):91-94.
[5]
闫丽梅,许爱华,任爽,等.一种变电站选址的新方法[J].高电压技术,2007,33(9):75-79.Yan Limei,Xu Aihua,Ren Shuang,et al.New method of selecting location of transformer substation[J].High Voltage Engineering,2007,33(9):75-79.
[6]
石峰,刘沛立.城市配电网规划方案的熵权决策方法[J].武汉大学学报(工学版),2012,45(2):212-215.Shi Feng,Liu Peili.Decision making method for urban power distribution grid planning using entropy weight[J].Engineering Journal of Wuhan University,2012,45(2):212-215.
[7]
万卫,王淳,程虹,等.电网评价指标体系的初步框架[J].电力系统保护与控制,2008,36(24):14-18.Wan Wei,Wang Chun,Cheng Hong,et al.Preliminary frame of index system for evaluating power network[J].Power System Protection and Control,2008,36(24):14-18.
[8]
蒋鹏,顾洁,楼晓东.电网规划技术经济评价方案研究[J].华东电力,2010,38(1):24-25.Jiang Peng,Gu Jie,Lou Xiaogdong,et al.Research on power grid program and economic evaluation[J].East China Electric Power,2010,38(1):24-25.
[9]
吴雪峰,张焰.电力市场下基于实物期权理论的电网投资经济评价[J].电网技术,2007,31(1):78-80.Wu Xuefeng,Zhang Yan.Research on economic evaluation of power grid investment based on real option theory in electricity market[J].Power System Technology,2007,31(1):78-80.
[10]
陈承.基于价值理论的上海电网投资经济评价方法[J].电网技术,2008,32(2):213-215.Chen Cheng.Economic evaluation method of Shanghai’s network investment based on value theory[J].Power System Technology,2008,32(2):213-215.
[11]
曾鸣,陈英杰,胡献忠,等.基于多层次模糊综合评价法的我国智能电网风险评价[J].华东电力,2011,39(4):535-539.Zeng Ming,Chen Yingjie,Hu Xianzhong,et al.The risk assessment of China's smart grid based on multilevel fuzzy comprehensive evaluation method[J].East China Electric Power,2011,39(4):535-539.
[12]
曹丽鹏,李志刚,王国玲,等.配电网可靠性的云综合评判法[J].电工技术学报,2015,(S1):418-421.Cao Lipeng,Li Zhigang,Wang Guoling,et al.Reliability evaluate for distribution network based on cloud model[J].Transactions of China Electrotechnical Society,2015,(S1):418-421.
[13]
黄雄峰,翁杰,张宇娇.微电网建设规划方案评估与选择[J].电工技术学报,2015,30(21):76-81.Huang Xiongfeng,Weng Jie,Zhang Yujiao.Evaluation and selection of microgrid construction planning schemes[J].Transactions of China Electrotechnical Society,2015,30(21):76-81.
[14]
沈广,苏海锋,袁喆.基于全寿命周期安全效能成本的配网规划方案评价研究[J].华东电力,2013,41(1):131-135.Shen Guang,Su Haifeng,Yuan Zhe.The panning scheme evaluation for distribution network based on the life cycle safety efficiency cost[J].East China Electric Power,2013,41(1):131-135.
[15]
Saaty T L.The Analytic Hierarchy Process[M].New York:Mc Grwa-Hill,1980.
[16]
王化吉,宗长富,管欣,等.基于模糊层次分析法的汽车操纵稳定性主观评价指标权重确定方法[J].机械工程学报,2011,47(24):83-90Wang Huaji,Zong Changfu,Guan Xin,et al.Method of determining weights of subjective evaluation indexes for car handling and stability based on fuzzy analytic hierarchy process[J].Journal of Mechanical Engineering,2011,47(24):83-90.
[17]
丁明,过羿,张晶晶,等.基于效用风险熵权模糊综合评判的复杂电网节点脆弱性评估[J].电工技术学报,2015,30(3):214-223.Ding Ming,Guo Yi,Zhang Jingjing,et al.Node vulnerability assessment for complex power grids based on effect risk entropy-weighted fuzzy comprehensive evaluation[J].Transactions of China Electro Technical Society,2015,30(3):214-223.
[18]
黄文杰,傅砾,肖盛.采用改进模糊层次分析法的风速预测模型[J].电网技术,2010,(7):164-168.Huang Wenjie,Fu Li,Xiao Sheng,et al.A predictive model of wind speed based on improved fuzzy analytical hierarchy process[J].Power System Technology,2010,(7):164-168.
[19]
李龙.基于LCC理论的输电网规划方案评价研究[D].杭州:浙江大学,2012.Li Long.Transmission network planning program evaluation based on LCC theory[D].Hangzhou:Zhejiang University,2012.