杜海金,张建新,吴东云,等.粉喷桩单桩承载力的时效分析[J].岩石力学与工程学报,2002,21(4):586-589.Du Haijin,Zhang Jianxin,Wu Dongyun,et al.Time effect on bearing capacity of single cement soil pile[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(4):586-589.
[2]
黄雨,叶为民,唐益群,等.打入桩荷载–沉降性状的时间效应分析[J].岩石力学与工程学报,2006,25(8):1710-1713.Huang Yu,Ye Weimin,Tang Yiqun,et al.Analysis of time effect on load-settlement behavior of driven piles[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(8):1710-1713.
[3]
李丽华,陈轮,高盛焱,等.翠湖湿地软土触变性试验研究[J].岩土力学,2010,31(3):765-768.Li Lihua,Chen Lun,Gao Shengyan,et al.Experimental research on thixotropy of wetland soft soil in Cuihu[J].Rock and Soil Mechanics,2010,31(3):765-768.
[4]
沈水龙,唐翠萍,庞晓明,等.不同水泥土混合桩周围土体的扰动与强度恢复[J].岩土力学,2006,27(10):1827-1830.Shen Shuilong,Tang Cuiping,Pang Xiaoming,et al.Disturbance and strength recovery of surrounding clays around soil-cement columns installed by different mixing methods[J].Rock and Soil Mechanics,2006,27(10):1827-1830.
[5]
李国松,王宪忠,白志强,等.关于单桩承载力的时间效应浅析[J].吉林地质,2010,29(1):133-134.Li Guosong,Wang Xianzhong,Bai Zhiqiang,et al.About the time effect of single pile bearing capacity is analysed[J].Jilin Geology,2010,29(1):133-134.
[6]
沈建华,汪稔,郑郧,等.湛江组结构性黏土区域微观结构特性研究[J].岩土力学,2013,34(7):1931-1936.Shen Jianhua,Wang Ren,Zheng Yun,et al.Research on regional microstructure characteristics of structural clay of Zhanjiang formation[J].Rock and Soil Mechanics,2013,34(7):1931-1936.
[7]
符秋生.静压预应力管桩单桩承载力试验研究[J].公路,2012,(8):151-156.Fu Qiusheng.Experimental study on bearing capacity of single pile with static pressure pre-stressed pipe pile[J].Highway,2012,(8):151-156.
[8]
叶为民,黄雨,唐益群,等.饱和软土中打入式预制桩单桩承载力的时效性[J].岩土力学,2000,21(4):367-369.Ye Weimin,Huang Yu,Tang Yiqun,et al.Time effect of bearing capacity of driven pile in saturated soil[J].Rock and Soil Mechanics,2000,21(4):367-369.
[9]
张明义,刘俊伟,张忠苗,等.基于隔时复压试验的静压桩优化设计方法[J].岩土工程学报,2010,32(2):320-324.Zhang Mingyi,Liu Junwei,Zhang Zhongmiao,et al.Optimum design method of jacked piles based on interval re-pressed test[J].Chinese Journal of Geotechnical Engineering,2010,32(2):320-324.
[10]
李雄,刘金砺.饱和软土中预制桩承载力时效的研究[J].岩土工程学报,1992,14(4):9-16.Li Xiong,Liu Jinli.Time effect study on bearing capacity of precast pile in saturated soft soil[J].Chinese Journal of Geotechnical Engineering,1992,14(4):9-16.
[11]
马海龙.开口桩与闭口桩承载力时效的试验研究[J].岩石力学与工程学报,2008,27(z2):3349-3353.Ma Hailong.Filed test on time effect of bearing capacity on end-open pile and end-closed pile[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(z2):3349-3353.
[12]
赵楠.扩底短桩承载力时间效应分析[J].岩土工程学报,2011,33(S2):498-501.Zhao Nan.Time effect analysis of bearing capacity of belled short pile[J].Chinese Journal of Geotechnical Engineering,2011,33(S2):498-501.
[13]
桂林.饱和软黏土桩承载力时间效应模型试验[J].土工基础,2008,22(5):67-69.Gui Lin.Time-effect model test of pile bearing capacity of saturated soft clay[J].Soil Engineering and Foundation,2008,22(5):67-69.
[14]
雷华阳,吕乾乾,刘利霞.考虑超静孔隙水压力消散的管桩承载力时效性研究[J].工程地质学报,2012,20(5):815-820.Lei Huayang,LüQianqian,Liu Lixia.Growth of pile bearing capacity over time considering the dissipation of excess pore pressure[J].Journal of Engineering Geology,2012,20(5):815-820.
[15]
徐建平,潘树林.典型施工作用下的土体性质变异研究[J].华中科技大学学报(城市科学版),2002,19(1):39-43,53.Xu Jianpin,Pan Shulin.Research on variances of characteristics of soil by typical construction[J].Journal of Huazhong University of Science and Technology(Urban Science Edition),2002,19(1):39-43,53.