宋兴君,李守义,叶林.预应力闸墩锚固形式研究[J].水力发电学报,2006,25(5):92-96.Song Xingjun,Li Shouyi,Ye Lin.Study on the anchorage forms of prestressed pier[J].Journal of Hydroelectric Engineering,2006,25(5):92-96.
[2]
马吉明,逄阿强,佟志强.闸墩预应力锚索新形式的探索[J].水力发电学报,2004,23(3):79-83.Ma Jiming,Pang Aqiang,Tong Zhiqiang.Research on new style of prestressed cables for gate pier[J].Journal of Hydroelectric Engineering,2004,23(3):79-83.
[3]
朱暾,邢贵碧.弧形闸门预应力闸墩颈部开槽设计初探[J].水力发电学报,1994,13(1):18-26.Zhu Tun,Xing Guibi.Research on design of setting cavity in radial gate prestressed pier[J].Journal of Hydroelectric Engineering,1994,13(1):18-26.
[4]
李传才,贺采旭,肖明俊.大推力弧门支座新结构型式的研究[J].水利水电技术,1993,24(9):43-46.Li Chuancai,He Caixu,Xiao Mingjun.Research on new structural form support of large thrust radial gate[J].Water Resources and Hydropower Engineering,1993,24(9):43-46.
[5]
贺采旭,李传才,何亚伯.大推力预应力闸墩的设计方法[J].水利水电技术,1997,28(6):24-29.He Caixu,Li Chuancai,He Yabai.Design method of large thrust prestressed pier[J].Water Resources and Hydropower Engineering,1997,28(6):24-29.
[6]
司建辉,简政,乔明秋.拱形空腔预应力锚块优化[J].武汉大学学报(工学版),2014,47(2):185-188.Si Jianhui,Jian Zheng,Qiao Mingqiu.Optimization of arch cavity prestressed anchor block[J].Engineering Journal of Wuhan University,2014,47(2):185-188.
[7]
夏菲菲.糯扎渡溢洪道新型预应力闸墩工作性态研究及敏感性分析[D].南京:河海大学,2007.Xia Feifei.Study on work behavior of new prestressed pier and sensitivity analysis of Nuozhadu spillway[D].Nanjing:Hohai University,2005.
[8]
陈震,徐远杰.基于弹塑性损伤模型的预应力闸墩非线性有限元分析[J].武汉大学学报(工学版),2010,43(4):481-484.Chen Zhen,Xu Yuanjie.Nonlinear finite element analysis of prestressed pier based on elastoplastic damage model[J].Engineering Journal of Wuhan University,2010,43(4):481-484.
[9]
张世宝,张淙皎,解伟.大型泄洪排沙闸预应力闸墩结构模型试验研究[J].水力发电学报,2009,28(4):92-96.Zhang Shibao,Zhang Congjiao,Xie Wei.Study on model test for a large scale prestressed pier of a flood releasing and scouring sluice[J].Journal of Hydroelectric Engineering,2009,28(4):92-96.
[10]
李树山,高丹盈,解伟.空腔锚块式预应力闸墩结构受力性能试验研究[J].长江科学院院报,2012,29(12):99-102.Li Shushan,Gao Danying,Xie Wei.Mechanical behavior of prestressed gate pier with hollow anchor block[J].Journal of Yangtze River Scientific Research Institute,2012,29(12):99-102.
[11]
王志良.开槽预应力闸墩应力集中特性研究[D].昆明:昆明理工大学,2006.Wang Zhiliang.Study on stress concentration characteristics of slotted prestressed pier[D].Kunming:Kunming University of Science and Technology,2006.
[12]
刘俊柏,林可冀.预应力闸墩技术及其在我国水电工程中的应用[J].水力发电,1991,17(5):20-24.Liu Junbai,Lin Keji.Pier prestressed technology and its application in hydropower projects in China[J].Water Power,1991,17(5):20-24.
[13]
韩韬,张建辉,张喜武,等.新型锚块在预应力闸墩设计中的研究与应用[J].水力发电,2012,38(5):31-33.Han Tao,Zhang Jianhui,Zhang Xiwu,et al.Study on new anchor block in the design of prestressed pier[J].Water Power,2012,38(5):31-33.
[14]
司建辉,简政,蒲锰,等.预应力闸墩锚块空腔位置的优化[J].武汉大学学报(工学版),2010,43(1):43-46.Si Jianhui,Jian Zheng,Pu Meng,et al.Optimization of anchor cavity position in prestressed pier block[J].Engineering Journal of Wuhan University,2010,43(1):43-45.
[15]
胡清义.预应力闸墩优化设计研究[D].南京:河海大学,2005.Hu Qingyi.Study on the optimization design of prestressed pier[D].Nanjing:Hohai University,2005.
[16]
傅少君,邱焕峰.小湾导流中孔闸墩开裂成因及工作性态分析[J].沈阳工业大学学报,2014,36(5):573-577.Fu Shaojun,Qiu Huanfeng.Analysis on cracking cause and working behavior of sluice piers for middle diversion outlets of Xiaowan arch dam[J].Journal of Shenyang University of Technology,2014,36(5):573-577.