尾砂胶结充填体与岩体耦合作用机理研究 Proportion optimization of cemented tailings backfill and its interaction mechanism with rocks in room-and-pillar stope:a case study
燕洪波.尾砂分层充填采矿法几项技术问题[C]//中国金属学会黄金采矿学术委员会.首届黄金采矿学术会议论文集,招远,2007:35-49.Yan Hongbo.Several technical problems of slicing tailings backfill mining method[C]//Academic Committee of Gold Society of Chinese Society of Metals.Proceedings of the First Academic Conference on Gold Mining,Zhaoyuan,2007:35-49.
[2]
中国矿业大学.“三下”采煤设计、论证及煤矿开采损害的防治与评估[Z].国家科技成果,2004.China University of Mining and Technology.Mining design,demonstration,hazards evaluation and prevention for coal mines with“Under Three”condition[Z].National Scientific and Technological Achievements,2004.
[3]
周爱民.矿山废料胶结充填[M].北京:冶金工业出版社,2007.Zhou Aimin.Mine Tailing Cemented Filling[M].Beijing:Metallurgical Industry Press,2007.
[4]
王铮朗.中深部金属矿保安矿柱爆破回采的动力响应特性研究[D].武汉:武汉理工大学,2014.Wang Zhenglang.Study on dynamic response of safety pillars blastingmining in medium-deep metal mine[D].Wuhan:Wuhan University of Technology,2014.
[5]
姚振巩.矿山充填体作用机理与铝基复合充填胶凝材料研究[D].长沙:中南大学,2010.Yao Zhengong.Investigation on the interaction mechanism of backfill and aluminum matrix composites cogulation material for filling mines[D].Changsha:Central South University,2010.
[6]
芦央泽.基于煤矸石似膏体胶结充填法控制下的覆岩移动规律研究[D].长沙:中南大学,2006.Lu Yangze.The disquisition of the filling like-plaster of the coal detritus in both cotrolling cover rock and the earth’s surface movement disciplinarian[D].Changsha:Central South University,2006.
[7]
杜绍伦,刘志祥.充填开采过程中岩体能量释放规律研究[J].金属矿山,2010,(5):13-15.Du Shaolun,Liu Zhixiang.Study on the laws of energy release of rock mass in filling mining[J].Metal Mine,2010,(5):13-15.
[8]
Li Li.Generalized solution for mining backfill design[J].International Journal of Geomechanics,2014,14(3):1-11.
[9]
周先明.金属矿山充填体作用机理研究实践[J].长沙矿山研究院季刊,1992,(S1):179-186.Zhou Xianming.The study and application of backfill mechanism in metal mines[J].Quarterly of Changsha Institute of Mining Research,1992,(S1):179-186.
[10]
Brady B H G,Brown E T.Rock Mechanics:for Underground Mining[M].London:George Allen&Unwin,1985.
[11]
Kostecki T,Spearing A J S.Influence of backfill on coal pillar strength and floor bearing capacity in weak floor conditions in the Illinois Basin[J].International Journal of Rock Mechanics and Mining Sciences,2015,(76):55-67.
[12]
蔡嗣经.胶结充填体强度设计的几个理论模型[J].江西冶金学院学报,1985,(3):39-45.Cai Sijing.Strength characteristics and designing of cemented hydraulic fill——designing of strength of cemented fill[J].Journal of Jiangxi Institute of Metallurgy,1985,(3):39-45.
[13]
陈育民,徐鼎平.FLAC/FLAC3D基础与工程实例[M].北京:中国水利水电出版社,2009.Chen Yumin,Xu Dingping.FLAC/FLAC3DFoundation and Engineering Examples[M].Beijing:China Water Power Press,2009.
[14]
Nawfal El Mkadmi,Michel Aubertin,Li Li.Effect of drainage and sequential filling on the behavior of backfill in mine stopes[J].Canadian Geotechnical Journal,2013,51(1):1-15.
[15]
Thompson B D,Bawden W F,Grabinsky M W.In situ measurements of cemented paste backfill at the Cayeli Mine[J].Canadian Geotechnical Journal,2012,49(7):755-772.
[16]
李鹏.尾砂胶结充填体强度影响因素分析与研究[D].昆明:昆明理工大学,2011.Li Peng.Impact factors for the strength of cemented tailings backfill body[D].Kunming:Kunming University of Science and Technology,2011.
[17]
吴翊.应用数理统计[M].长沙:国防科技大学出版社,2003.Wu Yi.Applied Mathematical Statistics[M].Changsha:National Defense University Press,2003.
[18]
赵阳升.矿山岩石流体力学[M].北京:煤炭工业出版社,1994.Zhao Yangsheng.Rock Fluid Mechanics in Mining[M].Beijing:China Coal Industry Publishing House,1994.