全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
-  2018 

双幅单向横坡PC斜拉桥横向不平衡索力研究 Study of asymmetric cable tensions of crosswise PC cable-stayed bridge with one-way slopes

Keywords: PC斜拉桥,单向横坡,弹性支承,不平衡索力,扭矩

Full-Text   Cite this paper   Add to My Lib

Abstract:

采用弹性支承连续梁受力分析的方法,通过计算不同主梁边界条件、不同拉索对主梁的弹性支撑刚度及不同拉索位置下不平衡索力提供的扭矩,研究了双幅单向横坡PC斜拉桥横向不平衡索力的计算方法.结果表明,横向拉索不平衡索力对主梁产生的扭矩并不等于对应节段恒载扭矩与活载扭矩之和,在设计过程中,需在斜拉桥整体结构中对合理成桥状态索力横向差值进行专项设计;相同布置的塔梁墩固结体系斜拉桥与半漂浮体系斜拉桥横向不平衡索力差值相同;最大横向不平衡索力状态存在于悬臂施工过程中;中索横向不平衡索力差值随拉索抗拉刚度的增大而增大,但各节段横向拉索索力差值所提供主梁扭矩比例并不由各节段拉索提供的弹性支撑刚度的比例关系确定

References

[1]  赵云.双联体独斜塔斜拉桥施工控制技术研究[D].西安:长安大学,2001:1-7.Zhao Yun.Study on twin-united body one pylon cablestayed bridge construction controlling technology[D].Xi’an:Chang’an University,2001:1-7.
[2]  卜铭.具有单横坡的箱梁剪力滞效应研究[D].长沙:长沙理工大学,2005:9-10.Bu Ming.The research on the shear lag effect of single-crossslope thin-walled box girder[D].Changsha:Changsha University of Science&Technology,2005:9-10.
[3]  卜铭,胡贤成,田仲初,等.具有单横坡的箱梁剪力滞效应分析及试验研究[J].中外公路,2007,(1):104-107.Bu Ming,Hu Xiancheng,Tian Zhongchu,et al.The experimental study and analysis on the shear lag effect of box girders with one-way slopes[J].Journal of China and Foreign Highway,2007,(1):104-107.
[4]  严国香.曹娥江大桥主桥斜拉桥设计[J].黑龙江科技信息,2014,(8):237-238.Yan Guoxiang.Design of cable-stayed bridge of Cao’e River Bridge[J].Heilongjiang Science and Technology Information,2014,(8):237-238.
[5]  牛祥恒.单索面钢箱梁斜拉桥抗扭性能研究[D].西安:长安大学,2014:19-48.Niu Xianghen.Study on torsional behavior of surface of steel box girder cable-stayed bridge with single cable[D].Xi’an:Chang’an University,2014:19-48.
[6]  杨允表,朱鸿蕾.关于大跨度单索面斜拉桥抗风与抗扭分析[J].中国市政工程,2001,(1):30-32.Yang Yunbiao,Zhu Honglei.Wind and torsion resistance analysis of single plane long span cable stayed bridges[J].China Municipal Engineering,2001,(1):30-32.
[7]  刘兆丰,戴显荣,赵人达,等.联塔分幅斜拉桥塔结构模型试验设计及加载索力优化[J].世界桥梁,2008,(4):50-53.Liu Zhaofeng,Dai Xianrong,Zhao Renda,et al.Model test design and optimization of cable force loading of pylon structure of cable-stayed bridge with jointed pylons and separated grders[J].World Bridges,2008,(4):50-53.
[8]  许伟龙.预应力混凝土宽箱梁单索面斜拉桥抗扭性能研究[D].杭州:浙江工业大学,2011:1-6.Xu Weilong.Study on torsional behavior of prestressed concrete wide box girder cable stayed bridge with single cable plane[D].Hangzhou:Zhejiang University of Technology,2011:1-6.
[9]  申文杰.基于索面布置的扇形索面斜拉桥桥塔稳定性分析[J].山西交通科技,2016,(4):74-77.Shen Wenjie.The stability analysis of fan-shaped cable-stayed bridge tower based on the cable plane layout[J].Shanxi Science&Technology of Communication,2016,(4):74-77.
[10]  康小方,方诗圣,张利,等.静风荷载下的大跨度斜拉桥稳定性分析[J].合肥工业大学学报:自然科学版,2012,(5):652-656.Kang Xiaofang,Fang Shisheng,Zhang Li,et al.Stability analysis of long-span cable-stayed bridge under static wind load[J].Journal of Hefei University of Technology:Natural Science,2012,(5):652-656.
[11]  陈星烨,芮伟国.双菱形连塔斜拉桥动力特性分析[J].中外公路,2010,30(5):162-166.Chen Xingye,Rui Weiguo.Dynamic characteristics analysis of cable-stayed bridge with double jointed diamond pylons[J].Journal of China and Foreign and China Highway,2010,30(5):162-166.
[12]  吴礼杰.双联体独塔预应力混凝土斜拉桥极限承载力分析[D].西安:长安大学,2015:12-16.Wu Lijie.Study on ultimate load bearing capacity of prestressing force concrete cable-stayed bridge with double couplet of single tower[D].Xi’an:Chang’an University,2015:12-16.
[13]  中交公路规划设计院.JTG D60-2004公路桥涵设计通用规范[S].北京:人民交通出版社,2004.CCCC Highway Consultants Co.,Ltd.JTG D60-2004General Code for Design of Highway Bridges and Culverts[S].Beijing:China Communication Press,2004.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133