|
- 2016
考虑残值的二手设备租赁预防维护策略优化
|
Abstract:
摘要: 针对具有一定年龄的二手设备租赁的特殊性,提出周期预防维护策略。该维护策略从设备的全生命周期出发,综合考虑设备的残值、年龄、预防维护、小修以及惩罚机制等因素对利润的影响,建立以出租方期望利润最大化为目标的周期预防维护模型,并给出模型取得最优策略的理论证明。最后通过算例分析表明,该策略符合二手设备租赁维护的实际情况,可为出租方提供有效的维护解决方案。
Abstract: For the lease of the second-hand equipment with certain past age, a periodic preventive maintenance strategy was presented. Several factors from the life cycle of the equipment which influence the profit of the lessor, such as the equipments residual value, age, preventive maintenance, minimal repair and punishment mechanism were considered. Under this maintenance scheme, a mathematical model based on the expected total profit of the lessor was established, and the optimal maintenance policies were derived such that the expected total profit was maximized. The proof was givern to obtain the optimal policy of the model. Finally, in case study, the numerical results show that the proposed strategy is practical and can provide effective maintenance solutions for lessors
[1] | TAN J S, KRAMER M A. A general framework for preventive maintenance optimization in chemical process operations[J]. Computers and Chemical Engineering, 1997, 21(12):1451-1469. |
[2] | BARLOW R, HUNTER L. Optimum preventive maintenance policies[J]. Operations Research, 1960, 8(1):90-100. |
[3] | WANG H. A survey of maintenance policies of deteriorating systems[J]. European Journal of Operational Research, 2002, 139(3):469-489. |
[4] | PHAM H, WANG H. Imperfect maintenance[J]. European Journal of Operational Research, 1996, 94(3):425-438. |
[5] | JATURONNATEE J, MURTHY D N P, BOONDISKULCHOK R. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1):201-215. |
[6] | YEH R H, CHANG W L, LO H C. Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age[J]. Mathematical and Computer Modelling, 2011, 54(9):2014-2019. |
[7] | CHENG C Y, ZHAO X F, CHEN M, et al. A failure-rate-reduction periodic preventive maintenance model with delayed initial time in a finite time period[J]. Quality Techonlogy and Quantitative Management, 2014,11(3):245-254. |
[8] | MELCHOR-HERNáNDEZ C L, RIVAS-DáVALOS F, MAXIMOV S, et al. A model for optimizing maintenance policy for power equipment[J]. International Journal of Electrical Power and Energy Systems, 2015, 68:304-312. |
[9] | NAKAGAWA T, KOWADA M. Analysis of a system with minimal repair and its application to replacement policy[J]. European Journal of Operational Research, 1983, 12(2):176-182. |
[10] | YEH R H, LO H C, YU R Y. A study of maintenance policies for second-hand products[J]. Computers and Industrial Engineering, 2011, 60(3):438-444. |
[11] | CORIA V H, MAXIMOV S, RIVAS-DáVALOS F, et al. Analytical method for optimization of maintenance policy based on available system failure data[J]. Reliability Engineering and System Safety, 2015, 135:55-63. |
[12] | NAKAGAWA T. A summary of periodic replacement with minimal repair at failure[J]. Journal of the Operations Research Society of Japan, 1981, 24(3):213-228. |
[13] | PONGPECH J, MURTHY D N P. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering and System Safety, 2006, 91(7):772-777. |
[14] | YEH R H, KAO K C, CHANG W L. Optimal preventive maintenance policy for leased equipment using failure rate reduction[J]. Computers and Industrial Engineering, 2009, 57(1):304-309. |
[15] | YEH R H, CHEN C K. Periodical preventive-maintenance contract for a leased facility with Weibull life-time[J]. Quality and Quantity, 2006, 40(2):303-313. |
[16] | YEH R H, CHANG W L. Optimal threshold value of failure-rate for leased products with preventive maintenance actions[J]. Mathematical and Computer Modelling, 2007, 46(5):730-737. |
[17] | 金琳, 黄开敏, 周晓军. 租赁设备的多阶段预防性维护策略及优化[J]. 计算机集成制造系统,2013,19(12):2947-2953. JIN Lin, HUANG Kaimin, ZHOU Xiaojun. Multi-period preventive maintenance policy and optimization for leased equipment[J]. Computer Integrated Manufacturing Systems, 2013, 19(12):2947-2953. |
[18] | CHANG W L, LO H C. Joint determination of lease period and preventive maintenance policy for leased equipment with residual value[J]. Computers and Industrial Engineering, 2011, 61(3):489-496. |
[19] | SHAFIEE M, CHUKOVA S. Maintenance models in warranty: a literature review[J]. European Journal of Operational Research, 2013, 229(3):561-572. |
[20] | CHATTOPADHYAY G N, MURTHY D N P. Warranty cost analysis for second-hand products[J]. Mathematical and Computer Modeling, 2000, 31(10):81-88. |
[21] | PONGPECH J, MURTHY D N P, BOONDISKULCHOCK R. Maintenance strategies for used equipment under lease[J]. Journal of Quality in Maintenance Engineering, 2006, 12(1):52-67. |