A Framework of Output Specifications and Evaluation Method for Hospital PPP Projects

DOI: 10.4236/ojbm.2019.71012, PP. 167-179

Keywords: Public-Private Partnership (PPP), Analytic Hierarchy Process (AHP), Output Specification

Full-Text   Cite this paper   Add to My Lib

Abstract:

Introduction: Public-private partnership (PPP) has been adopted widely in infrastructure construction projects, and its application in medical and health service industry is increasing day by day. However, the performance of a PPP project could be affected by a number of factors and their interactions, due to its complexity in multiple stakeholders and stages. Previous researches on hospital PPP projects mainly focus on the factors which lead to success/failure, or the results of implementing PPP on hospital projects, or risk management, rather than its evaluation mechanism. So, to comprehensively promote and guarantee the effective implementation of the hospital PPP project, a scientif-ic quantitative evaluation method according to certain evaluation procedures and the performance evaluation system for hospital PPP projects are pro-posed from the perspective of the government.

References

[1]  Wijewardena, H. and Zoysa, A.D. (2005) A Factor Analytic Study of the Determinants of Success in Manufacturing SMEs. Faculty of Commerce—Papers.
[2]  Saaty, T.L. (1967) Modern Nonlinear Equations. Dover Publications.
[3]  Saaty, T.L. and Vargas, L.G. (2012) Models, Methods, Concepts & Applications of the Analytic Hierarchy Process. Springer US.
[4]  Vian, T., Mcintosh, N., Grabowski, A., et al. (2015) Hospital Public-Private Partnerships in Low Resource Settings: Perceptions of How the Lesotho PPP Transformed Management Systems and Performance. Health Systems & Reform, 1, 155-166.
https://doi.org/10.1080/23288604.2015.1029060
[5]  Chen, M., Zhu, Q.C. and Dong, D.M. (2011) Game Study on Construction Safety Supervision Based on System Dynamics. China Safety Science Journal, 21, 73-81.
[6]  Javed, A.A., Lam, P.T.I. and Chan, A.P.C. (2013) A Model Framework of Output Specifications for Hospital PPP/PFI Projects. Facilities, 31, 610-633.
https://doi.org/10.1108/f-02-2012-0014
[7]  Carr, V. and Tah, J.H.M. (2001) A Fuzzy Approach to Construction Project Risk Assessment and Analysis: Construction Project Risk Management System. Advances in Engineering Software, 32, 847-857.
https://doi.org/10.1016/S0965-9978(01)00036-9

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133