In this study, it is aimed to determine the ranking importance levels of the stages to be taken into consideration for new product development on a global scale in the automotive design process. New product design activity and stage-gate process differences between local automotive firms (serial production factory and stage-gate department in Turkey) and global automotive companies (serial production factory and stage-gate department in Turkey) are examined comparatively in the research area. In the automotive industry, which has been developing for a century, the question of how the local company products operating in the last sixty years have not been able to spread globally or how to develop global products is the background question of the research. For this purpose, one on one interviews were held with the managers of 3 national and 3 international automotive companies, who worked in the same region and who had previously designed a new vehicle, with design and product development departments.?According to?the data obtained by the AHP (Analytic Hierarchy Process) in the automotive design process, the importance of the criteria that should be taken into account for global product development has revealed. According to the results of the study, it was found that design validation stages were the most important globalization criterion in automotive design process as a new study area. In the comprehensive survey of the study, no other publication has been encountered to measure or evaluate the stages in the automotive design and new product development process in other sectors, including the vehicle industry. As in every industry sector, in the automotive industry, with the new product companies provide market development or competitive advantage. The new product is the life channel of a company and in the realization of this new vehicle; the disciplines of the automotive industry are formed by a hundred years of experience.
References
[1]
Candi, M. and Gemser, G. (2010) An Agenda for Research on the Relationship between Industrial Design and Performance. International Journal of Design, 4, 67-77.
[2]
Person, O., Snelders, D. and Schoormans, J. (2016) Assessing the Performance of Styling Activities: An Interview Study with Industry Professionals in Style-Sensitive Companies. Design Studies, 42, 33-55. https://doi.org/10.1016/j.destud.2015.10.001
[3]
Paker, F. A., Alppay, C. and Sertyesilisik, B. (2018) Use of the AHP Methodology in Vehicle Design Process Dynamics: Determination of the Most Effective Concept Phases for the New Automotive Product. Journal of Transportation Technologies, 8, 312-330. https://doi.org/10.4236/jtts.2018.84017
[4]
Ullman, D.G. (1992) The Mechanical Design Process. 2nd Edition, McGraw-Hill, New York.
[5]
Pahl, G. and Beitz, W. (1996) Engineering Design: A Systematic Approach. Springer, New York. https://doi.org/10.1007/978-1-4471-3581-4
[6]
Otto, K. and Wood, K. (2001) Product Design: Techniques in Reverse Engineering, Systematic Design and New Product Development. Prentice-Hall, New York.
[7]
Atilola, O., Tomko, M. and Linsey J. (2016) The Effects of Representation on Idea Generation and Design Fixation: A Study Comparing Sketches and Function Trees. Design Studies, 42, 110-136. https://doi.org/10.1016/j.destud.2015.10.005
[8]
Stevenson, H. (2008) American Automobile Advertising, 1930-1980. McFarland, Jefferson, NC.
[9]
O’Neill, B. (2009) Preventing Passenger Vehicle Occupant Injuries by Vehicle Design—A Historical Perspective from IIHS. Traffic Injury Prevention, 10, 113-126.
https://doi.org/10.1080/15389580802486225
[10]
Geels, F.W. and Penna, C.R. (2015) Societal Problems and Industry Reorientation: Elaborating the Dialectic Issue Life Cycle (DILC) Model and a Case Study of Car Safety in the USA (1900-1995) Research Policy, 44, 67-82.
https://doi.org/10.1016/j.respol.2014.09.006
[11]
Brosed, J., Aguilar, J., Guillomia, D. and Santolaria, J. (2011) 3D Geometrical Inspection of Complex Geometry Parts Using a Novel Laser Triangulation Sensor and a Robot. Sensors (Basel), 11, 90-110. https://doi.org/10.3390/s110100090
[12]
Soo, V.K., Compston, P. and Doolan M. (2015) Interaction between New Car Design and Recycling Impact on Life Cycle Assessment. Procedia CIRP, 29, 426-431.
https://doi.org/10.1016/j.procir.2015.02.055
[13]
Seidel, V.P. and O’Mahony, S. (2014) Managing the Repertoire: Stories, Metaphors, Prototypes, and Concept Coherence in Product Innovation. Organization Science, 25, 691-712. https://doi.org/10.1287/orsc.2013.0879
[14]
Elverum, C.W., Welo, T. and Steinert, M. (2014) The Fuzzy Front End: Concept Development in the Automotive Industry. ASME, Design Theory and Methodology, Buffalo.
[15]
Stylidis, K., Rossi M., Wickman, C. and Soderberg, R. (2016) The Communication Strategies and Customer’s Requirements Definition at the Early Design Stages: An Empirical Study on Italian Luxury Automotive Brands. Procedia CIRP, 50, 553-558.
https://doi.org/10.1016/j.procir.2016.04.062
[16]
Cajal, C., Santolaria, J., Acero, R. and Pueo, M. (2015) Introducing Design for Verification. Procedia Engineering, 132, 772-779.
[17]
Remiel, F.M., Cauvin, A. and Ferrarini, A. (2015) Verification of Design Rules as an Evaluation Method during the Reconfiguration Process of Production Systems. Papers Online, 48, 1676-1681. https://doi.org/10.1016/j.ifacol.2015.06.327
[18]
Chapurlat, V. (2013) UPSL-SE: A Model Verification Framework for Systems Engineering. Computers in Industry, 64, 581-597.
[19]
Jauregui-Becker, J. and Wits, W. (2015) Enabling Lean Design through Computer Aided Synthesis: The Injection Moulding Cooling Case. Procedia CIRP, 37, 260-264. https://doi.org/10.1016/j.compind.2013.03.002
[20]
Persson, J.G. (2016) Current Trends in Product Development. Procedia CIRP, 50, 378-383. https://doi.org/10.1016/j.procir.2016.05.088
[21]
Nordlund, M., Kim, S., Tate, D., Lee, T. and Hilario, L. (2016) Axiomatic Design: Making the Abstract Concrete. Procedia CIRP, 50, 216-221.
https://doi.org/10.1016/j.procir.2016.04.146
[22]
Verganti, R. (1997) Leveraging on Systemic Learning to Manage the Early Phases of Product Innovation Projects. R&D Management, 27, 377-392.
https://doi.org/10.1111/1467-9310.00072
[23]
Dow, P., Fortuna, J., Schwartz, D., Altringer, B., Schwartz, L. and Klemmer, R. (2012) Prototyping Dynamics: Sharing Multiple Designs Improves Exploration, Group Rapport, and Results. Design Thinking Research, 1, 47-70.
https://doi.org/10.1007/978-3-642-31991-4_4
[24]
Borjesson, S., Elmquist, M. and Hooge, S. (2014) The Challenges of Innovation Capability Building: Learning from Longitudinal Studies of Innovation Efforts at Renault and Volvo Cars. Journal of Engineering Technology Management, 31, 120-140. https://doi.org/10.1016/j.jengtecman.2013.11.005
[25]
Saaty, L. (1980) The Analytic Hierarchy Process: Planning, Priority Setting, Resources Allocation. McGraw-Hill, New York.
[26]
Erdogan, A., Saparauskas, J. and Turskis, Z. (2017) Decision Making in Construction Management: AHP and Expert Choice Approach. Modern Building Materials, Structures and Techniques. Procedia Engineering, 172, 270-276.
https://doi.org/10.1016/j.proeng.2017.02.111
[27]
Mohamed, B. (2016) Sustainable Construction Management in Developing Countries.
[28]
Gür, S., Hamurcu, M. and Eren, T. (2016) Using Analytic Network Process and Goal Programming Methods for Project Selection in the Public Institution. Les Cahiers du Mecas, 12, 36-51.
[29]
Makovsek, D. (2014) Systematic Construction Risk, Cost Estimation Mechanism and Unit Price Movements. Transport Policy, 35, 135-145.
https://doi.org/10.1016/j.tranpol.2014.04.012
[30]
Aziz, R. and Hafez, S. (2013) Applying Lean Thinking in Construction and Performance Improvement. Alexandria Engineering Journal, 52, 679-695.
https://doi.org/10.1016/j.aej.2013.04.008
[31]
Krylovas, A., Zavadskas, E., Kosareva, N. and Dadelo, S. (2014) New KEMIRA Method for Determining Criteria Priority and Weights in Solving MCDM Problem. International Journal of Information Technology & Decision Making, 13, 1119-1133. https://doi.org/10.1142/S0219622014500825
[32]
Whyte, J., Stasis, A. and Lindkvist, C. (2015) Managing Change in the Delivery of Complex Projects: Configuration Management, Asset Information and “Big Data”. International Journal of Project Management, 34, 339-351.
https://doi.org/10.1016/j.ijproman.2015.02.006
[33]
Hamurcu, M. and Eren, T. (2016) Cok Kriterli Karar Verme Yontemleriyle Rayli Sistem Projelerinin Siralanmasi. 3rd International Symposium on Railway Systems Engineering, Edinburgh, 3-5 October 2016, 559-566.
[34]
Zavadskas, E., Turskis, Z. and Antucheviciene, J. (2015) Selecting a Contractor by Using a Novel Method for Multiple Attribute Analysis: Weighted Aggregated Sum Product Assessment with Grey Values (WASPAS-G). Studies in Informatics and Control, 24, 141-150. https://doi.org/10.24846/v24i2y201502
[35]
Kahraman, C., Onar, S. and Oztaysi, B. (2015) Fuzzy Multicriteria Decision-Making: A Literature Review. International Journal of Computational Intelligence Systems, 8, 637-666. https://doi.org/10.1080/18756891.2015.1046325
[36]
Dong, Q. and Cooper, O. (2016) A Peer to Peer Dynamic Adaptive Consensus Reaching Model for the Group AHP Decision Making. European Journal of Operational Research, 250, 521-530. https://doi.org/10.1016/j.ejor.2015.09.016
[37]
Zhou, Q., Vinh, V. and Thai, L. (2016) Fuzzy and Grey Theories in Failure Mode and Effect Analysis for Tanker Equipment Failure Prediction. Safety Science, 83, 74-79. https://doi.org/10.1016/j.ssci.2015.11.013
[38]
Organ, A. and Yalcin, E. (2016) Performance Evaluation of Research Assistants by Copras Method. Social Sciences and Humanities, Vol. 1, Barcelona, 16-18 May 2016, 111-119.
[39]
Kundakci, N. and Isik, T. (2016) Integration of MACBET and COPRAS Methods to Select Air Compressor for a Textile Company. Decision Science Letters, 5, 381-394.
[40]
Andonova, V. and Ruiz Pava, G. (2016) The Role of Industry Factors and Intangible Assets in Company Performance in Colombia. Journal of Business Research, 69, 4377-4384. https://doi.org/10.1016/j.jbusres.2016.03.060
[41]
Koc, E. and Cetin, C. (2017) Marinalarda Deniz Operasyon islemleri, Sürec analizi: Ornek olay calismasi. Dokuz Eylül üniversitesi, Denizcilik Fakültesi Dergisi, 1-26.
[42]
Ozdemir, A. (2010) Yonetim Biliminde Arastirma Yontemleri ve Uygulamalar. Beta Yayincilik, Istanbul.
[43]
Jeston, J. and Nelis, J. (2014) Business Process Management: Practical Guidelines to Successful Implementations. Elsevier, Oxford.
https://doi.org/10.4324/9780203081327