With the realization of the limitations to top-down and bottom-up watershed management approaches in addressing issues associated with urbanization, a conceptual framework for a hybrid approach that tries to effectively integrate the advantages of the two approaches while overcoming their respective limitations, grass root watershed management model (GWAM), was proposed and presented. This paper presents the details of implementation and validation of GWAM at Shawsheen River watershed in Massachusetts, USA. An investigation on the major components of GWAM, a common platform to conduct the management, a partnership of two major stakeholder groups from government and non-governmental organizations, and a facilitation mechanisms were carried out in detail to gain the needed understanding on structure, process and function of a successful GWAM. Also the decision making process in addressing three major urban watershed issues; flooding, habitat and aquatic life impairment, and bacterial impairment, were examined through a set of cyclic steps. Based on the lessons learned, GWAM was enhanced as a general hybrid model. The most important challenge in sustaining GWAM was to keep differently motivated stakeholders together. As revealed in the Shawsheen watershed, science should play a key role in keeping differently motivated stakeholders together by providing needed facts, understandings, data, and knowledge. When scientifically sound solutions are vetted through a process of public involvement that supports appropriate regulatory actions, the most effective environmental decisions can be made.
References
[1]
Saravanapavan, T. and Yamaji, E. (2018) GWAM—An Institutional Model to Address Watershed Impacts from Urbanization: Conceptual Framework. Journal of Water Resources and Protection, 10, 896-905. https://doi.org/10.4236/jwarp.2018.109052
[2]
MRWC (Merrimack River Watershed Council) (2000) Water Flow Analysis: Shawsheen River Basin. Final Report, MA Executive Office of Environmental Affairs, Boston.
[3]
MADEP (Massachusetts Department of Environmental Protection) (1999) Final Massachusetts Section 303(d) List of Waters, 1998. Division of Watershed Management, Massachusetts Department of Environmental Protection, Worcester.
[4]
Saravanapavan, T., Yamaji, E., Voorhees, M. and Zhang, G. (2014) Using Hydrology as a Surrogate in TMDL Development for Impairments Caused by Multiple Stressors. Advances in Water Resource and Protection, 2, 1-10.
[5]
MRWC (Merrimack River Watershed Council) (2003) Shawsheen Bacteria TMDL Implementation Plan. Final Report. Project Number: 2001-01/MWI. Massachusetts Executive Office of Environmental Affairs, Boston.
[6]
Michaels, S. (2001) Making Collaborative Watershed Management Work: The Confluence of State and Regional Initiatives. Environmental Management, 27, 27-35. https://doi.org/10.1007/s002670010131
[7]
Massachusetts Executive Office of Environmental Affairs (2003) Shawsheen River 5-Year Watershed Action Plan 2003-2008. MA Executive Office of Environmental Affairs, Boston.
[8]
Saravanapavan, T., Anbumozi, V. and Yamaji, E. (2004) Using Percent Imperviousness as a Planning Tool in Watershed Management: Case Study of the Shawsheen in USA, Transactions of Association of Rural Planning, 23, 73-78. https://doi.org/10.2750/arp.23.23-suppl_73
[9]
MRWC (Merrimack River Watershed Council) (2001) HanscomStormwater System Computer Model—Model Development and Calibration. Final Report, MA Executive Office of Environmental Affairs, Boston.
[10]
Fuss and O’Neill (2011) Final Storm Water Management Plan for Hanscom Air Force Base, US Air Force, Concord.
[11]
MRWC (Merrimack River Watershed Council) (1999) Shawsheen River Watershed 1996-1998 Volunteer Monitoring Report, MA Executive Office of Environmental Affairs, Boston.
[12]
MADEP (Massachusetts Department of Environmental Protection) (2003) Draft Storm Water Pollutant Total Maximum Daily Load for Headwaters of the Shawsheen River, Division of Watershed Management, Massachusetts Department of Environmental Protection, TMDL Report MA83-08-2003-01, DWM Control Number CN: 168.00.627, Worcester.
[13]
MADEP (Massachusetts Department of Environmental Protection) (1990) Shawsheen River 1989 Water Quality Survey Data and Water Quality Analysis, Division of Water Pollution Control, Massachusetts Department of Environmental Protection, Publication No. 16, Worcester.
[14]
MADEP (Massachusetts Department of Environmental Protection) (1996) MADEP. 1996. 1995 Shawsheen Assessment Summary Report. Bureau of Resource Protection, Massachusetts Department of Environmental Protection. Worcester.
[15]
MADEP (Massachusetts Department of Environmental Protection) (2002) Draft Bacteria TMDL for the Shawsheen River Basin. Bureau of Resource Protection, Department of Environmental Protection. Draft Report MA83-01-2002-24, Worcester.