Barriers to the Adoption of BOT Contracts System for Infrastructural Development of Technical Universities in Ghana

DOI: 10.4236/jbcpr.2018.63007, PP. 103-111

Keywords: Ghana, Build Operate Transfer (BOT) Contracts, Technical Universities in Ghana

Full-Text   Cite this paper   Add to My Lib

Abstract:

The study was conducted with the aim of exploring the barriers to the adoption of BOT contract systems for infrastructural development of technical universities in Ghana. In an empirical questionnaire survey with professionals and experts in the construction and education sector, the respondents were invited to rate their perception on the barriers to the adoption of the BOT contracts systems. An interview session to satisfy ways of adopting the BOT contracts for infrastructural development in technical universities was conducted with selected professionals. The study revealed that the major barriers to the adoption of the BOT contract system are: delays in approval, corruption, reliability and credit worthiness of entities and expropriation. The study suggested that detailed policy or framework for implementing BOT contracts; proper planning by technical universities; and adequate protection for lenders is required for successful BOT implementation. Therefore there is a need to explore this concept, using adequate policy initiatives, proper measures and support from government to improve on the proper implementation of the BOT contracts in Technical Universities in Ghana.

References

[1]  Asian Development Bank (2006) Facilitating Public-Private Partnership for Accelerated Infrastructure Development in India Regional Workshops of Chief Secretaries on Public-Private Partnership. Workshop Report 2016, New Delhi, July, 2006.
[2]  Ghana News Agency (2015) http://www.ghananewsagency.org/
[3]  Ministry of Finance and Economic Planning (2011) National Policy on Public Private Partnerships. Government of Ghana, Ghana.
[4]  Augenblick, M. and Custer, B.S. (1990) The Build Operate and Transfer Approach to Infrastructure Projects in Developing Countries. Policy Research and External Affairs Working Papers, Urban Development Department, The World Bank, Geneva.
[5]  UN (1995) UNIDO BOT Guidelines. Geneva.
[6]  Mubin, S. and Ghafar, A. (2008) BOT Contracts: Applicability in Pakistan for Infrastructure Development. Pakistan Journal of Engineering and Applied Sciences, 3, 33-36.
[7]  Adeagbo and Kolawole (1999) Problems and Prospects of Build-Own-Operate-Transfer Contractual Arrangement in Nigeria. University of Jos, Jos.
[8]  Ahmed, F.M.S., Miroslaw, J.S., and Ismail, B. (2007) BOT Viability Models for Large Scale Infrastructure Projects. Journal of Construction Engineering and Management, 133, 50-63.
https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(50)
[9]  Wang, S.Q., et al. (2000) Evaluation and Management of Political Risks in China’s BOT Projects. Journal of Construction Engineering and Management, 126, 242-250.
[10]  Macdonald, R. (1997) Chinese BOT Risks. Research and Reports, Tokyo University, Tokyo.
[11]  Public Procurement Authority (2003) Public Procurement Act, 2003 (Act 663). Accra, Ghana.
[12]  Chan D.W.M., Chan A.P.C. and Lam P.T.I. (2006) A Feasibility Study of the Implementation of Public Private Partnership (PPP) in Hong Kong. Proceedings of the CIB W89 International Conference on Building Education and Research, Hong Kong, 10-13 April 2006.
[13]  Cheung, E., Chan, A.P.C. and Kajewski, S. (2009). Reasons for Implementing Public Private Partnership Projects: Perspectives from Hong Kong, Australian and British Practitioners. Journal of Property Investment & Finance, 27, 8195.
https://doi.org/10.1108/14635780910926685

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133