CMMI Product Team.CMMISM for Systems Engineering,Software Engineering,and Integrated Product and Process Development[R].Version 1.1,Continuous Representation (CMMI-SE/SW/IPPD,V1.1),Continuous Representation,CMU/SEI-2002-TR-003,December 2001.
[2]
CMMI Product Team.CMMISM for Systems Engineering,Software Engineering,Integrated Product and Process Development,and Supplier Sourcing[R].(CMMI-SE/SW/IPPD/SS,V1.1),Continuous Representation,CMU/SEI-2002-TR-011,March 2002.
[3]
CMMI Product Team.CMMISM for Systems Engineering,Software Engineering,Integrated Product and Process Development,and Supplier Sourcing[R].(CMMI-SE/SW/IPPD/SS,V1.1),Staged Representation,CMU/SEI-2002-TR-012,March 2002.
[4]
Watts S Humphrey.The Team Software ProcessSM (TSPSM)[R].CMU/SEI-2000-TR-023,November 2000.
[5]
ISO/IEC TR 15504-(1~9) Information Technology-Software Process Assessment[R].Switzerland,1998.
[6]
Tricia Oberndorf,Lisa Brownsword,Carol A Sledge.An Activity Framework for COTS-Based Systems[R].CMU/SEI-2000-TR-010,October 2000.
[7]
Mark C Paulk,B Curtis,M B Chrissis,C V Weber.Capability Maturity Model for Software[R].Version 1.1,CMU/SEI-93-TR-24,Software Engineering Institute,Carnegie Mellon University,February 1993.
[8]
CMMI Product Team.CMMISM for Systems Engineering,Software Engineering,and Integrated Product and process Development[R].(CMMI-SE/SW/IPPD,V1.1),Staged Representation,CMU/SEI-2002-TR-004,December 2001.
[9]
Watts S Humphrey.The Personal Software ProcessSM (PSPSM)[R].CMU/SEI-2000-TR-022,November 2000.
[10]
Bill Curtis,William E Hefley,Sally A Miller.People Capability Maturi-ty Model P-CMM[R].Version 2.0,CMU/SEI-2001-MM-01,July 2001.