A R Moro,H Yu,G Kelleher.Hybrid heuristic search for the scheduling of flexible manufacturing systems using Petri nets[J].IEEE Transaction on Robotics and Automation,2002,18 (2):240-245.
[2]
T C Chiang,Y S Shen,L C Fu.Adaptive lot/equipment matching strategy and GA based approach for optimized dispatching and scheduling in a wafer probe center[A].Proceedings of the IEEE International Conference on Robotics and Automation[C].New Orieaus,LA:IEEE Computer Society Press,2004.3125-3130.
[3]
P R Kumar.Re-Entrant Lines[J].Special Issue on Queuing Networks,1993,13(1):87-110.
[4]
Y D Kim,S O Shim,B Choi,H Hwang.Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility[J].IEEE Transactions on Semiconductor Manufacturing,2003,16(2):290-298.
[5]
王中杰,吴启迪.半导体生产线控制与调度研究[J].计算机集成制造系统,2002:8(8):607-610.Wang Zhongjie,Wu Qidi.Research of control and scheduling on semiconductor manufacturing line[J].Computer Integrated Manufacturing Systems,2002:8(8):607-610.(in Chinese)
[6]
R Billings,J Hasenbein.A survey of applications of fluid models to semiconductor operations[A].Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing[C].2000.97-103.
[7]
R R Chen,S P Meyn.Value iteration and optimization of mul-ti-class queuing networks[J].Queueing system,1999,32 (13):65-97.
[8]
M C Zhou.Modeling,analysis,simulation,scheduling,and control of semiconductor manufacturing systems:A Petri net approach[J].IEEE Transactions on Semiconductor Manufacturing,1998,11(3):333-357.
[9]
T C Chiang,A C Hnang,L C Fu.Modeling,scheduling,and performance evaluation for wafer fabrication:a queueing colored Petri-net and GA-based approach[J].IEEE Transactions on Robotics and Automation,2006,3(3):330-338.
L Li,F Qiao,Q D Wu.Swarm intelligence based dynamic re-al-time scheduling approach for semiconductor wafer fab[J].Chinese Journal of Mechanical Engineering,18 (1),2005.3:71-74.
[12]
Y X Shen,R C Leachman.Stochastic wafer fabrication scheduling[J].IEEE Transactions on Semiconductor Manufacturing,2003,16(1):2-14.
[13]
W Kubiak,S Lou.Mean flow time minimization in reentrant job shops with a hub[J].Operations Research,1999,44:764-776.
[14]
Y F Hung,R C Leachma.A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations[J].IEEE Transactions on Semiconductor Manufacturing,1996,9 (2):257-269.
[15]
S Kumar,P R Kumar.Fluctuation smoothing policies are stable for stochastic re-entrant lines[J].Discrete Event Dynamic Systems,1996,6(2):361-370.
[16]
S I Mason,J W Fowler,W M Carlyle.A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops[J].Journal of Scheduling,2002,5:247-262.
[17]
R Dabbas.A new scheduling approach using combined dispatching criteria in semiconductor manufacturing systems[D].PHD Thesis,Arizona State University,Tempe,AZ,1999.
[18]
H Hwang,J U Sun.Production sequencing problem with reentrant work flows and sequence dependent setup times[J].Computers & Industrial Engineering,1997,33(5):773-776.
[19]
王遵彤.半导体硅片加工生产线调度与控制问题研究[R].上海:同济大学博士后出站报告,2005.Wang Zuntong.Research on Scheduling and Controlling for Semiconductor Wafer Fab[R].Shanghai:Postdoctoral Research Report of Tongji University,2005.(in Chinese)
[20]
C C Chiu,P C Chang,N H Chiu.A case-based expert support system for due-date assignment in a wafer fabrication factory[J].Journal of Intelligent Manufacturing,2003,14:287-296.
[21]
V Jain,R Swamkap,M K Tiwari.Modeling and analysis of wafer fabrication scheduling via generalized stochastic Petri net and simulated annealing[J].International Journal of Production Research,2003,41 (15):3502-3527.
[22]
X Q Zuo,Y S Fan.Solving the job shop scheduling problem by an immune algorithm[A].Proceedings of 2005 International Conference on Machine Learning and Cybernetics[C].Gunngzhou,China,2005,6:3282-3287.
[23]
余建军,孙树栋,郑锋.基于动态评价免疫算法的车间作业调度研究[J].机械工程学报,2005,41(3):25-31.Yu Jianjun,Sun Shudong; Zheng Feng.Job-shop scheduling study by dynamic evaluation based immune algorithm[J].Chinese Journal of Mechanical Engineering,2005,41 (3):25-31.(in Chinese)
[24]
刘波,王凌,金以慧,黄德先.微粒群优化算法研究进展[J].化工自动化及仪表,2005,32(3):1-6.Liu Bo; Wang Ling; Jin Yihui; Hunng Dexian.Advances in particle swarm optimization algorithm[J].Control and Instruments in Chemical Industry,2005,32(3):1-6.(in Chinese)
[25]
夏蔚军,吴智铭,张伟,杨根科.微粒群优化在Job-shop调度中的应用[J].上海交通大学学报,2005,39(3):381-385.Xia Weijun,Wu Zhiming,Zhang Wei,Yang Genke.Application of particle swarm optimization in the job-shop scheduling problem[J].Journal of Shanghai Jiaotong University,2005,39 (3):381-385.(in Chinese)
[26]
J C Bean,R B John,E N Charles.Match-up scheduling with multiple resources,release dates,and disruptions[J].Operations Research,1991,39(3):470-483.
[27]
S F Smith.OPIS:a methodology and architecture for reactive scheduling,Intelligent Scheduling[M].San,Francisco:Morgon Kaufmann Press,1994.29-66.
[28]
R J Abumaizar,J A Svestka.Rescheduling job shops under random disruptions[J].International Journal of Production Research,1997,35 (5):2065-2082.
[29]
J H Chen,L C Fu,M H Lin,A C Huang.Petri-net and GA-based approach to modeling,scheduling,and performance evaluation for wafer fabrication[J].IEEE Transactions on Robotics and Automation,2001,17(5):619-636.
[30]
J G Yi,S W Ding,D Z Song.Steady-state throughput and scheduling analysis of multi-cluster tools for semiconductor manufacturing:A decomposition approach[A].Proceedings of IEEE International Conference on Robotics and Automation[C].Barcelona,Spain:IEEE Computer Society Press,2005.292-298.
[31]
O Rose.Estimation of the cycle time distribution of a wafer fab by a simple simulation model[A].Proceedings of the International Conference on Semiconductor Manufacturing Operational Modeling and Simulation[C].San Francisco,CA,1999.133-138.
[32]
F Baslett,K M Chandy,R R Muntz.Open,closed and mixed networks of queues with different classes of customers[J].Journal ACM,2001,22(2):248-260.
[33]
F Qiao,L Li,Q D Wu.Colored Petri net based hierarchical scheduling model for semiconductor production line[A].Fifth World Congress on Intelligent Control and Automation[C].Hangzbou,China,2004,4:3014-3018.
[34]
李莉,乔非,吴启迪.半导体生产线群体智能调度模型研究[J].中国机械工程,2004,15(22):2006-2009.Li Li,Qiao Fei,Wu Qidi.Research on swarm intelligence based scheduling model for semiconductor wafer fab[J].China Mechanical Engineering,2004,15(22):2006-2009.
[35]
V D Shenai.A mathematical programming based procedure for the scheduling of lots in a wafer fab[D].Master Thesis,Blacksbrug,Virginia,2001.9.
[36]
HODD et al.Capacity planning under demand uncertainty for semiconductor manufacturing[J].IEEE Transactions on Semiconductor Manufacturing,16(2),2003:273-280.
[37]
T K Hwang,S C Chang.Design of a lagrangian relaxationbased hierarchical production scheduling environment for semiconductor wafer fabrication[J].IEEE Transactions on Robotics and Automation,2003,19(4):566-578.
[38]
R C Leachman,D A Hedges.Benchmarking semiconductor manufacturing[J].IEEE Transactions on Semiconductor Manufacturing,1996,9(2):158-169.
[39]
阎平凡,张长水.人工神经网络与模拟进化计算[M].清华大学出版社.2000.Yun Pingfan,Zhang Chungshui.Artificial Neural Networks and Evolutionary Computation[M].Beijing:Tsinghua University Press,2000.(in Chinese)
[40]
金辉宇.神经元动态规划在可重人生产系统调度中的应用[D].沈阳:沈阳自动化研究所工学硕士论文,2001.7.Jin Huiyu.Application of neuro-dynamic programming in the scheduling of re-entrant lines[D].Shenyang:Dissertation for the master Degree in Engineering of Shenyang Institute of Automation,2001,7.(in Chinese)
[41]
吴继伟,萧蕴诗.多智能体技术在半导体生产线调度中的应用[J].计算机集成制造系统.CIMS,2003,9(8):641-644.Wu Jiwei,Xiao Yunshi.Multi-agent technology in scheduling of semiconductor production line[J].Computer Integrated Manufacturing Systems,2003,9(8):641-644.(in Chinese)
[42]
B Hajek.Cooling schedules for optimal annealing[J].Math Oper Res,1988,13(2):311-329.
[43]
王凌,郑大钟.Meta-beurisde算法研究进展[J].控制与决策,2000,15(3):257-262.Wang Ling,Zheng Da-zhong.Meta-heurisdc algorithms:a review[J].Control and Decision,2000,15 (3):257-262.(in Chinese)
[44]
H W Wen,L C Fu,S S Huang.Modeling,scheduling,and prediction in wafer fabrication system using queueing Petri net and genetic algorithm[A].Proceeding of IEEE international conference on robotics and automation[C].Scoul,Korea:IEEE Computer Society Press,2001,4:3559-3564.
[45]
李士勇,陈永强,李研.蚁群算法及其应用[M].哈尔滨工业大学出版社,2004.Li Shiyong,Chen Yongqiang,Li Yan.Ant Colony Algorithm and Applications[M].Harbin:Harbin Institute of Technology Press,2004.(in Chinese)
[46]
Y J Li,T J Wu.A nested hybrid ant colony algorithm for hybrid production scheduling problems[J].Acta Automation Sinica,2003,29:95-101.
[47]
李莉.半导体生产线动态实时智能调度方法研究[R].上海:同济大学博士后出站报告,2005.Li Li.Research on Dynamic real-time Intelligent Scheduling for Semiconductor Wafer Fab[R].Shanghai:Postdoctoral Research Report of Tongji University,2005.(in Chinese)
[48]
L Li,F Qiao,H Jiang,Q D Wu.The Research on Pheromone Based Dynamic Intelligent Scheduling for Semiconductor Wafer Fabrication[A].Fifth World Congress on Intelligent Control and Automation[C] ,Hangzhou,China,2004.6:2990-2994.
[49]
M S Akturk,G Elif.Match-up scheduling under a machine breakdown[J].European Journal of Operational Research,1999,11(2):81-97.
[50]
许潇红.半导体制造过程中的重调度研究[D].上海:同济大学工学硕士论文,2006.3.Xu Xiaohong.Rescheduling in semiconductor manufacting system[D].Shanghai:Dissertation for the master Degree in Engineering of Tongji University,2006,3.(in Chinese)
[51]
薛陈江.基于模糊逻辑算法的半导体生产线设备维护调度研究[D].上海:同济大学工学硕士论文,2006.3.Xue Chenjiang.Fuzzy logic based machine maintenance scheduling for semiconductor fabrication facilities[D].Shanghai:Dissertation for the master Degree in Engineering of Tongji University,2006,3.(in Chinese)
[52]
李莉,乔非,吴启迪.半导体制造重调度研究[J].中国机械工程,2006,17(6):612-615.Li Li,Qiao Fei,Wu Qidi.Research on rescheduling for semiconductor wafer fab[J].China Mechanical Engineering,2006,17(6):612-615.(in Chinese)