Wang Wei;Wang Lianjie;Wang Hongcai;Qiao Zijiang.Stability analysis of Kunlun Mountain tunnel for Qinghai-Tibet railway[J].Acta Geoscientia Sinica,2002(04)
Wang Lianjie;Ding Yuanchen;Liu Qisheng,In situ stress measurements of the diversion tunnel from the Yellow River,Journal of Geomechanics,1996(01).
[9]
Lu Mingwan;Luo Xuefu,Elasticity theory,水利信息网,2001.
[10]
Liu Hongwen,Material Mechanics,北京:高等教育出版社,2004.
[11]
Liao Chunting;Wu Manlu;Zhang Chunshan.Recent ground stress measurement of the Kunlun Mountains and Yangba jing area in Qinghai-Tibet Plateau and its engineering significance[J].Acta Geoscientia Sinica,2002(04)
Xie Furen;Chen Qunce;Cui Xiaofeng,Environmental research of crustal stress in China,北京:地质出版社,2003.
[14]
方开泰,实用回归分析,北京:科学出版社,1989.
[15]
王连捷;丁原辰;刘琦胜,引黄隧洞地应力测量,地质力学学报,1996(01).
[16]
刘鸿文,材料力学,北京:清华大学出版社,2004.
[17]
李金锁;彭华;崔巍.云南西北部铁路隧道地应力测试及工程应用[J].地质力学学报,2005(02)
[18]
Wang Lianjie;Pan Lizhou;Liao Chunting,Crust stress measurements and their application in engineering,北京:地质出版社,1991.
[19]
State Compilation Group on Standard,GB 50218-1994.Classifying standard of engineering rock mass,北京:中国计划出版社,1994.
[20]
Li Jinsuo;Peng Hua;Cui Wei,Geo-stress measurements and engineering application of a railway tunnel in northwestern Yunnan,Journal of Geomechanics,2005(02).
[21]
Institute of Crust Stress;Chinese Bureau of Seismology;Central Institute;Japanese Power,Formation and expansion of the crack from hydraulic pressure fracturing,北京:地震出版社,1999.