Dong Sheng, Liu Defu. 1999. Grey Markov Model for predicting the maximum water level every year. Journal of Hydraulic Engineering, (1): 60~64 (in Chinese with English abstract).
[2]
Knotters M, van Walsum P E V. 1997. Estimating fluctuation quantities from time series of water-table depths using models with a stochastic component. J. Hydrol. , 197(1) :25~46.
[3]
National Criterion of People\'s Republic of China: Technical Request of management model for groundwater resource. (GB/T14497-93).Being into effect on March 1, 1994 (in Chinese).
[4]
Qian Jiazhong, Zhu Xueyu, Wu Jianfeng, Pan Guoying. 2000. Grey Markov Model for predicting mine discharge. Journal of China Coal Society, 25(1) :71~75 (in Chinese with English abstract).
[5]
Simon B, Disney R L. 1984. Markov renewal process and renewal process: Some conditions for equivalence. New Zealand Oper.Res. , 12(1):19~29.
[6]
Wu Jianfeng, Zhu Xueyu, Liu Jianli. 1999. Using genetic algorithm based simulated annealing penalty function to solve groundwater management model. Science in China (series E), 42(5): 521~529.
[7]
Xie Chunhong, Zhu Xueyu, Huang Weihua, et al. 1988. Evaluation on fracture-karst water resources in a well field in Xuzhou City.Carsologica Sinica, 7 (3): 265 ~ 272 (in Chinese with English abstract).
[8]
Yan Ying, Cheng Shixue, Cheng Kan. 1995. Operational Research and Stochastic Model. Beijing: China People\'s University Press,99~145 (in Chinese).
[9]
Zhou Nianqing, Qian Jiazhong, Wu Jianfeng, Zhu Xueyu, Li Genyi.2001. The controlling mechanism of the preferred plane on groundwater flow and the determination and application of preferred parameters in the karst in Northern China. Geological Review, 47(2):151~156 (in Chinese with English abstract).