Du Ronghuang, Kang Zhicheng, Chen Xunqian, et al. 1987. A comprehensiveinvestigation and control planning for debris flow in the Xiaojiang River Basin of YunnanProvince. Beijing: Science Press.
[6]
Luo yuanhua, Zhang Liang, Zhang Yecheng. 1998. The methodological research ofgeological disaster risk assessment. Beijing: Geology Press.
[7]
Nakagawa H, Takahashi T. 1997. Estimation of debris flow hydrograph and hazardarea. Proc. First Intl. Conf. On Debris Flow Hazards Mitigation. The American Society ofCivil Engineers, 64~73.
[8]
Shieh Cheng-lun, Jan Chyan-deng, Tsai Yuan-fan. 1996. A numerical simulation ofdebris flow and its application. Natural Hazards, 13: 39~54.
[9]
胡俭. 1997. 精通Visual C++ for Windows 95/NT. 北京:电子工业出版社.
[10]
罗元华,张梁,张业成. 1998. 地质灾害风险评估方法. 北京:地质出版社.
[11]
Liu Xilin, Tang Chuan. 1995. Danger assessment on debris flow. Beijing: SciencePress.
[12]
Takahashi T. 1991. Debris flow. In: Balkema A A, ed. Published for InternationalAssociation for Hydraulic Research. Rotterdam Brookfield.
[13]
Wu jishan, Tian Lianquan, Kang Zhicheng, et al. 1993. Debris flow and itscomprehensive control. Beijing: Science Press.