SUN K, ZHENG D, LU Q. Splitting strategies for islanding operation of large?scale power systems using OBDD?based methods[J]. IEEE Transactions on Power Systems, 2003,18(2):912-922.?
[2]
ZHAO Q, SUN K, ZHENG D, et al. A study of system splitting strategies for island operation of power system:a two?phase method based on OBDD[J]. IEEE Transactions on Power Systems, 2003,18(4):1556-1665.?
[3]
SUN K, ZHENG D, LU Q. A simulation study of OBDD?based proper splitting strategies for power systems underconsideration of transient stability[J].IEEE Transactions on Power Systems,2005,20(1):389-399.?
[4]
汪成根,张保会, 李鹏,等.基于自适应解列的电力系统解列面快速搜索[J].西安交通大学学报,2009,43(2):90-95. ?WANG Chenggen, ZHANG Baohui, LI Peng, et al. Fast search for islanding strategy based on self?adaptive system islanding[J]. Journal of Xi’an Jiaotong University, 2009,43(2):90-95.?
[5]
袁季修.试论防止电力系统大面积停电的紧急控制?电力系统安全稳定运行的第三道防线[J].电网技术,1999,23(4):1-4.? YUAN Jixiu. Emergency control for preventing widespread blackout of power system the third line of defence[J]. Power System Technology, 1999,23(4):1-4.?
[6]
张保会.加强继电保护与紧急控制系统的研究提高互联电网安全防御能力[J].中国电机工程学报, 2004,24(7):1-6. ?ZHANG Baohui. Strengthen the protection relay and urgency control systems to improve the capability of security in the interconnected power network[J]. Proceedings of the Csee, 2004,24(7):1-6.?
[7]
张保会,张毅刚, 刘海涛.基于本地量的振荡解列装置原理研究[J].中国电机工程学报,2001,21(12):67-72 ?ZHANG Baohui, ZHANG Yigang, LIU Haitao. Study on principle of power system separation device based on local electrical parameter[J].Proceedings of the Csee, 2001,21(12):67-72.?
[8]
潘贞存,桑在中, 戴方涛, 等.电网自动解列的新判据[J].电力系统自动化,1995,19(7):34-37. ?PAN Zhencun,SANG Zaizhong, DAI Fangtao, et al. A new criterion for power system automatic separation[J]. Automation of Electric Power Systems, 1995,19(7):34-37.?
[9]
沈沉,吴佳耘, 乔颖,等.电力系统主动解列控制方法的研究[J].中国电机工程学报,2006,26(13):1-6. ?SHEN Chen, WU Jiayun, QIAO Ying, et al. Studies on active splitting control of power systems[J]. Proceedings of the Csee, 2006,26(13):1-6.?
[10]
XUE Y. Integrated extended equal area criterion?theory and applications[J]. Electricity (English Journal of CSEE) , 1995(4):97-103.?
[11]
STANTON S E,SLIVINSKY C,MARTIN K,et al.Application of phasor measurements and partial energy analysis in stability large disturbances[J].IEEE Trans on PWRS,1995,10(1):297-306.?
[12]
段振国,高曙, 杨以涵, 等. 基于图论理论的电力系统解列策略生成方法[J].中国电力,1998,31(3):7-9. ?DUAN Zhenguo, GAO Shu, YANG Yihan, et al. A method of determining the point of system splitting based on graph theory[J].China Power, 1998,31(3):7-9.?
[13]
陈西颖,李卫星,郭志忠. 电力系统失步解列研究[J].继电器,2006,34(8):30-34. ?CHEN Xiying, LI Weixing, GUO Zhizhong. Research of wide area measure system based criteria for detecting the synchronization loss for power system[J]. Relay,2006,34(8):30-34.?
[14]
HOU D, TZIOUVARAS D A. Out?of?step pretection enhancements[C]// The Eighth IEE International Conference on Developments in Power System Protection. Amsterdam, Netherlands, 2004:135-139.?
[15]
蔡国伟,穆钢, CHAN K W, 等.基于网络信息的暂态稳定性定量分析-支路势能法[J].中国电机工程学报,2004,24(5):1-6. ?CAI Guowei; MU Gang, CHAN K W, et al.Branch potential energy method for power system transient stability assessment based on network dynamic variables[J].Proceedings of the Csee, 2004,24(5):1-6.?
[16]
倪以信,陈寿孙.动态电力系统的理论和分析[M].北京:清华大学出版社,2002:350. ?NI Yixin, CHEN Shousun. Dynamic power system analysis[M].Beijing: Tsinghua University Press,2002:350.?
[17]
乔颖,沈沉,卢强.大规模电网解列控制可行性判断[J].中国电机工程学报,2008,28(25):50-55. ?QIAI Ying, SHEN Chen, LU Qiang. Study on feasibility of islanding control of large?scale power systems[J]. Proceedings of the Csee, 2008,28(25):50-55.?