宋克志, 袁大军, 王梦恕. 基于盾构掘进参数分析的隧道围岩模糊判别[J].土木工程学报, 2009, 42(1): 107-113. ?SONG Kezhi, YUAN Dajun, WANG Mengshu. Fuzzy identification of surrounding rock conditions based on analysis of shield tunneling data[J]. China Civil Engineering Journal, 2009, 42(1): 107-113.?
HOWARTH D F, ADAMSON W R, BERNDT J R. Correlation of model tunnel boring and drilling machine performances with rock properties[J]. Int J Rock Mech Min Sci and Geomech Abstr, 1986, 23(2): 171-175.?
[5]
YAMAMOTO T, SHIRASAGI S, YAMAMOTO S, et al. Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data[J]. Tunneling and Underground Space Technology, 2003, 18(2/3): 213-221.?
[6]
徐前卫. 盾构施工参数的地层适应性模型试验及其理论研究[D].上海: 同济大学, 2006:41-64. ?XU Qianwei. Study on the simulated model test of shield machine’s working parameters applicable to different stratums and its theoretical investigation[D]. Shanghai: Tongji University, 2006:41-64.?
[7]
刘明月, 杜彦良, 麻士琦. 地质因素对TBM掘进效率的影响[J]. 石家庄铁道学院学报, 2002, 15 (4): 40-43. ?LIU Mingyue, DU Yanliang, MA Shiqi. Analysis of relationship between geologic condition and the effiiency of TBM boring[J]. Journal of Shijiazhuang Railway Institute, 2002, 15 (4): 40-43.?
[8]
宋克志, 孙谋. 复杂岩石地层盾构掘进效能影响因素分析[J]. 岩石力学与工程学报, 2007, 26(10): 2092-2096. ?SONG Kezhi, SUN Mou. Analysis of influence of shield tunneling performance in complex rock strata[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(10): 2092-2096.?