REISSER E.Analysis of shear lag in box beam by the principle of minimum potential energy[J].Quarterly of Applied Mathematics,1946,5(3):268-278.?
[2]
KUZMANOVIC B O,GRAHAM H J.Shear lag in box gerders[J].J Strcut Div,ASCE,1981,107(9):1701-1712.?
[3]
LUO Q Z,LI Q S.Shear lag of thin?walled curved box girder bridges[J].ASCE J Engrg Mech,2000,126(10):1111-1114.?
[4]
WU Yaping,LIU Shizhong,ZHU Yuanlin,et al.Matrix analysis of shear lag and shear deformation in thin walled box beams[J].ASCE J Engrg Mech,2003,129(8):944-950.?
[5]
LERTSIMA C, CHAISOMPHOB T.Deflection of simply supported box girder including effect of shear lag[J].Computers and Structures,2005,84:11-18.?
[6]
CHANG S T. Shear?lag effect in simple supported prestressed concrete box?girder bridge[J].ASCE J of Bridge Engineering,2004,9(2):178-184.?
[7]
周世军.箱梁剪力滞效应分析的有限梁段法[J].铁道学报,2007,29(5):85-88.? ZHOU Shijun.Finite segment method of shear lag analysis of box girders[J].Journal of the China Railway Society, 2007,29(5):85-88.?[8]张士铎,王文州.荷载横向作用位置对箱型梁剪力滞效应的影响[J].湖南大学学报,1995,22(2):109-115.? ZHANG Shiduo,WANG Wenzhou.Shear lag effect on the lateral loading position of box girder bridge[J].Journal of Hunan University,1995,22(2):109-115.?
[8]
吴亚平,杨玟,周大为,等.荷载横向变位下箱梁顶板与底板的剪滞效应分析[J].土木工程学报,2007,40(10):8-12.?WU Yaping,YANG Mei,ZHOU Dawei, et al.Analyses of the shear lag effect on the top and bottom plates of box beams with varying loading locations[J].China Civil Engineering Journal,2007,40(10):8-12.?
[9]
王勖成.有限单元法[M].北京:清华大学出版社,2003:47-49.?
[10]
吴幼明,何小媚.一类常系数微分方程组的通解[J].四川理工学院学报,2006,19(2):68-71.? WU Youming,HE Xiaomei. General solution to one kind of systems of ordinary diferential equation with constant coeficients[J].Jouarnal of Sichuan University of Science & Engineering, 2006,19(2):68-71.?