陈旺. 产品设计资源受限项目调度规划与算法 [D].大连:大连理工大学,2010:18-20. CHEN Wang.Project planning and scheduling with constrained resource for product design[D]. Dalian:Dalian University of Technology, 2010: 18-20.
[2]
ANGELYN J. Sortie generation capacity of embarked airwings [EB/OL]. http://www.dtic.mil/cgi-bin/GetTRDoc?Lo cation=U2&doc=GetTRDoc.pdf&AD=ADA359178.[2011-09-09].
[3]
岳奎志,侯志强,韩维,等.机群出动能力的Markov模型[J]?. 系统仿真学报, 2008:20(22): 6278-6281. YUE Kuizhi, HOU Zhiqiang, HAN Wei,et al.Markov model of air feet sortie ability[J]. Journal of System Simulation, 2008:20(22): 6278-6281.
[4]
ROSENTHAL R E, WALSH J W. Optimizing flight operations for an aircraft carrier in transit [EB/OL]. http://www.dtic.mil/cgi-bin/GetTRDoc?AD= ADA275653&Location=U2&doc= GetTRDoc.pdf. [2011-09-09].
[5]
XIA G Q, CHEN H Z, WANG Y H. Approximate mean value analysis of airport sortie generation orocess on condition aircrafts launch in batches[C]//2010 International Conference on Computer, Mechatronics, Control and Electronic Engineering (CMCE). Changchun,China:2010,413-416.
[6]
林华,占明锋,周丰.舰载机回收任务的优化调度算法及仿真[J].海军工程大学学报,2008,20(1):50-54. LIN Hua, ZHAN Mingfeng, ZHOU Feng. Optimization schedule algorithm and simulation to recycle planes on carrier[J]. Journal of Naval University of Engineering,2008,20(1):50-54.
WANG Ping, ZHANG Li, HOU Yu. Command and decision system modeling for launching preparations of carrier aircraft based on agent[J]. Advanced Manufacture and Management,2007,26(5):33-34.
[9]
岳奎志,韩维,王庆官.基于排队论的机群出航能力模型[J]. 海军航空工程学院学报,2009,24(2):224-228. YUE Kuizhi,HAN Wei,WANG Qingguan. A queuing theory model of the air fleet sortie ability [J]. Journal of Naval Aeronautical and Astronautical University, 2009, 24(2):224-228.
[10]
冯强,曾声奎,康锐.基于MAS的舰载机动态调度模型[J].航空学报,2009,30(11):2119-2125. FENG Qiang, ZENG Shengkui, KANG Rui. A MAS-based model for dynamic scheduling of carrier aircraft[J]. Acta Aeronautica et Astronautica Sinica,2009,30(11):2119-2125.
[11]
侯玉, 汪斌, 王平, 等.基于Petri网工作流在舰载机出航准备建模中的应用[J].先进制造与管理,2007,26(8): 25-26. HOU Yu,WANG Bin,WANG Ping,et al. Application of workflow network based on Petri net in launching out modeling of aircrafts on carrier[J]. Ordnance Industry Automation,2007,26(8): 25-26.
[12]
DAVIS E, PATTERSON J. A comparison of heuristic and optimum solutions in resource-constrained project scheduling[J]. Management Science,1975, 21(8): 944-955.
[13]
邓林义.资源受限的项目调度问题及其应用研究[D].大连:大连理工大学,2008:5-7. DENG Linyi. Research on the resource-constrained project scheduling problem with its application[D]. Dalian: Dalian University of Technology,2008:5-7.