LEE C Y. Machine scheduling with an availability constraint[J]. Journal of Global Optimization,1996,9(3):395-416.
[2]
MOSHEIOV G,SARIG A. Scheduling a maintenance activity to minimize total weighted completion time[J]. Computers and Mathematics with Applications, 2009,57(4):619-623.
[3]
YANG S J. Minimizing total completion time on a single machine with a flexible maintenance activity[J]. Computers & Operations Research,2011,38(4):755-757.
[4]
LIAO L W. Parallel machine scheduling with machine availability and eligibility constraints[J]. European Journal of Operational Research,2008,184(2):458-467.
[5]
RACEM M. Identical parallel machine scheduling under availability constraints to minimize the sum of completion times[J]. European Journal of Operational Research,2009,197(3):1150-1165.
[6]
TAN Z Y,CHEN Y. On the exact bounds of SPT for scheduling on parallel machines with availability constraints[J].International Journal of Production Economics,2013,146(1):293-299.
[7]
CHOU J H,LOW C Y. A single-machine scheduling problem with maintenance activities to minimize makespan[J].Applied Mathematics and Computation,2010,215(11):3929- 3935.
[8]
XUEP F. Single machine scheduling with piece-rate maintenance and interval constrained position-dependent processing times[J]. Applied Mathematics and Computation 2014,226:415-417.
[9]
LEE J Y. Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance[J]. Computers & Operations Research,2012,39(9):2196-2205.
[10]
YANG S J. Single-machine scheduling problems simultaneously with deterioration and learning effects under deteriorating multi-maintenance activities consideration[J]. Computers & Industrial Engineering, 2012,62(1):271-275.
[11]
蒋志高,董明. 考虑维护且加工时间可变的单机调度问题研究[J]. 工业工程与管理,2011,16(3):68-74.JIANG Zhigao,DONG Ming. Study on single machine problem with maintenance and variable processing time [J]. Industrial Engineering and Management,2011,16(3):68-74.
[12]
CHEN J S. Scheduling of non-resumable jobs and flexible maintenance activities on a single machine to minimize makespan[J]. European Journal of Operational Research,2008, 190:90-120.
[13]
金玉兰,蒋祖华.预防性维修计划和生产调度的多目标优化[J].哈尔滨工程大学学报,2011,32(9):1205-1209.JIN Yulan,JIANG Zuhua. Multi-objective optimization research on preventive maintenance and production scheduling[J].Journal of Harbin Engineering University,2011,32(9):1205-1209.
[14]
崔维伟,陆志强. 单机系统的生产调度与预防性维护的集成优化[J]. 上海交通大学学报,2012,46 (12):2009-2013.CUI Weiwei,LU Zhiqiang. Integrating production scheduling and preventive maintenance planning for a single machine[J]. Journal of Shanghai Jiaotong University,2012,46 (12):2009-2013.
[15]
SUN K B. Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines[J]. International Journal of Production Economics, 2010,124(1):151-158.
[16]
程贞敏,李洪兴. 最小化时间表长的平行机调度近似算法研究[J]. 北京师范大学学报,2012,48(1):11-15.CHENG Zhenmin,LI Hongxin. Approximated algorithm for identical machine scheduling with minimized makespan [J]. Journal of Beijing Normal University,2012,48(1):11-15.
[17]
XU D H. Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan [J]. Computers & Operations Research,2008,35(4):1344-1349.
[18]
GUPTA J N D. A new heuristic algorithm for the one-dimensional bin-packing problem[J]. Production Planning & Control,1999,10(6):598-603.
[19]
BURKARD R E. A note on MULTIFIT scheduling for uniform machines[J]. Computing,1998,61(1):277-283.