QIAO J L, JIN Y, TIAN W L, et al. The shear-lag effect on curved box girder bridge considering prestress and initial curvature[J]. Applied Mechanics and Materials, 2012, 204: 2100-2104.
[2]
TAYI N, ?ZAKC A M. Free vibration analysis and shape optimization of box-girder bridges in straight and curved planform[J]. Engineering Structures, 2002, 24(5): 625-637.
[3]
CHANDRA MOHAN RAO B D V, RAMANA RAO N V. Analysis and optimization of box girder bridges in curved planform[J]. Journal of The Institution of Engineers (India): Series A, 2012, 93(1): 1-8.
[4]
GOMEZ H C, FANNING P J, FENG M Q, et al. Testing and long-term monitoring of a curved concrete box girder bridge[J]. Engineering Structures, 2011, 33(10): 2861-2869.
[5]
赵青,肖卓. 行波效应对连续曲线箱梁桥地震反应的影响[J]. 地震工程与工程振动, 2010, 3: 123-128.ZHAO Qing, XIAO Zhuo. Effects of traveling wave on seismic responses of continuous curved box-girders bridge[J]. Journal of Earthquake Engineering and Engineering Vibration, 2010, 3:123-128.
田秀兰,陈伏立. 曲线梁桥设计理论述评[J]. 福建建筑, 2005(1): 368-370.TIAN Xiulan, CHEN Fuli. Commentary of the curved bridge design theory[J]. Fujian Architecture and Construction, 2005(1): 368-370.
[8]
常连生,刘衍平. 求解连续梁弯曲的传递矩阵法[J]. 现代电力,1998, 4: 74-79. CHANG Liansheng, LIU Yanping. Transfer matrix method to solve the curved continuous beams[J]. Modern Electric Power,1998, 4: 74-79.
[9]
李惠生.用传递矩阵法计算弯梁的内力和变形[J].桥梁建设, 1991, 1(3): 65-66.LI Huisheng. Internal force and deformation calculations of the curved beams with the transfer matrix method[J]. Bridge Construction, 1991, 1(3): 65-66.
[10]
瞿尔仁, 王建立. 传递矩阵法在曲线桥结构分析中的应用[J]. 合肥工业大学学报: 自然科学版, 1999, 22(6): 73-79.QU Erren, WANG Jianli. Transfer matrix method applied to structural analysis of curve bridge[J]. Journal of Hefei University of Technology: Natural Science, 1999, 22(6): 73-79.
[11]
项贻强, 金海明. 铰接曲板桥传递矩阵法的计算[J]. 华东公路, 1991, 73(6): 53-58. XIANG Yiqiang, JIN Haiming. Calculations of the articulated curved slab-bridge by transfer matrix method[J]. East China Highway, 1991, 73(6): 53-58.
[12]
何云勇.一种分析曲线箱梁剪力滞效应的传递矩阵法[J].重庆交通大学学报:自然科学版, 2010, 29(5): 670-673.HE Yunyong. Transfer matrix method for analyzing shear lag effect of curved box girder bridge[J]. Journal of Chongqing Jiaotong University: Natural Sciences, 2010, 29(5): 670-673.
[13]
孙建鹏. 曲线箱梁桥状态传递理论研究[D]. 西安:西安建筑科技大学, 2010: 48-57.SUN Jianpen. Study on state transfer theory of curved box bridge[D]. Xi’an:Xi’an University of Architecture and Technology, 2010: 48-57.
[14]
王福敏. 曲线梁桥传递矩阵设计法与工程应用实践[M]. 北京:人民交通出版社, 2009: 1-34.WANG Fumin. Transfer matrix design method of the curved girder and its engineering application[M]. Beijing: China Communications Press, 2009: 1-34.