PARK C, SEO J. Mathematical modeling and solving procedure of the planar storage location assignment problem[J]. Computers & Industrial Engineering, 2009, 57(3): 1062-1071.
[2]
PARK C, SEO J. Comparing heuristic algorithms of the planar storage location assignment problem[J]. Transportation Research Part E: Logistics and Transportation Review, 2010, 46(1): 171-185.
[3]
张志英, 申钢, 刘祥瑞, 等. 基于最短路算法的船舶分段堆场调度[J]. 计算机集成制造系统, 2012, 18(9): 1982-1990. ZHANG Zhiying, SHEN Gang, LIU Xiangrui, et al. Block storage yard scheduling of shipbuilding based on shortest-path algorithm[J]. Computer Integrated Manufacturing Systems, 2012, 18(9): 1982-1990.
[4]
张志英, 徐建祥, 计峰. 基于遗传算法的船舶分段堆场调度研究[J]. 上海交通大学学报, 2013, 47(7): 1036-1042. ZHANG Zhiying, XU Jianxiang, JI Feng. Shipbuilding yard scheduling approach based on genetic algorithm[J]. Journal of Shanghai Jiaotong University, 2013, 47(7): 1036-1042.
[5]
SRINIVAS M, PATNAIK L M. Adaptive probabilities of crossover and mutation in genetic algorithms[J]. IEEE Transactions on Systems, Man, and Cybernetics, 1994, 24(4): 656-667.
[6]
李莉, 乔非, 吴启迪. 半导体制造重调度研究[J]. 中国机械工程, 2006, 17(6): 612-616. LI Li, QIAO Fei, WU Qidi. Research on rescheduling for semiconductor wafer fabs[J]. China Mechanical Engineering, 2006, 17(6): 612-616.
[7]
FATTAHI P, JOLAI F, ARKAT J. Flexible job shop scheduling with overlapping in operations[J]. Applied Mathematical Modelling, 2009, 33(7): 3076-3087.
[8]
SABUNCUOGLU I, KARABUK S. Rescheduling frequency in an FMS with uncertain process times and unreliable machines[J]. Journal of Manufacturing Systems, 1999, 18(4): 268-283.
[9]
李铁克, 肖拥军, 王柏琳. 基于局部性修复的HFS机器故障重调度[J]. 管理工程学报, 2010, 4(3): 45-49. LI Tieke, XIAO Yongjun, WANG Bolin. HFS rescheduling under machine failures based on local repair[J]. Journal of Industrial Engineering and Engineering Management, 2010, 4(3): 45-49.
[10]
JEMAI J, ZEKRI M, MELLOULI K. An NSGA-II algorithm for the green vehicle routing problem[M]//HAO J K, MIDDENDORF M. Evolutionary Computation in Combinatorial Optimization. Berlin: Springer, 2012: 37-48.
[11]
PSYCHAS I D, MARINAKI M, MARINAKIS Y. A parallel multi-start NSGA II algorithm for multiobjective energy reduction vehicle routing problem[C]//Evolutionary Multi-Criterion Optimization. Springer, 2015: 336-350.
[12]
SPLIET R, GABOR A F, DEKKER R. The vehicle rescheduling problem[J]. Computers & Operations Research, 2014, 43(3): 129-136.