Abstract:

针对大型民用核动力船舶的安全性问题,应用层次分析方法对民用船舶核动力装置的二回路系统进行故障分析,以此为其运行安全性提供理论依据和技术支撑。通过建立一个基于研究目标的多层次递阶结构模型对民用核动力船舶二回路系统进行故障分析及风险评估,确定对二回路系统影响最大的指标参数。研究结果表明:二回路系统中汽动给水泵系统、电动给水泵系统、主给水流量控制系统和高压给水加热器系统为风险较大的关键因素。

References

[1]  王乃彦. 发展核能是中国的重要出路[J]. 能源与节能,2011(3):3-10.WANG Naiyan. Development of nuclear energy is an important way for China[J]. Energy and Energy Conservation,2011(3):3-10.
[2]  PARK Sujin,YANG Huichang. Study on nuclear accident precursors using AHP and BBN[J]. Science and Technology of Nuclear Installations, 2014(2):255-267.
[3]  YANG Z, WANG J, BONSALL S, et al. Maritime security: assessment and management[J]. Risk Analysis, 2009,29(1):95-120.
[4]  DNV. Nuclear powered ships-a feasibility study[R].(s.l.): DNV, 2010: 14-16.
[5]  MA Junyuan, XIAO Jianhua, MA Rui,et al. FPSO global strength and hull optimization[J]. Journal of Marine Science and Application, 2014, 13(1): 55-61.
[6]  ADAM C, VENABLES D, SPENCE A. Nuclear power, climate change and energy security: exploring British public attitudes[J]. Energy Policy, 2011, 39(9) : 4823-4833.
[7]  朱继洲. 核反应堆安全分析[M]. 西安:西安交通大学出版社,2000:40-45.
[8]  KONOVESSIS D, CAI Wenkui, VASSALOS D. Development of Bayesian network models for risk-based ship design[J]. Journal of Marine Science and Application, 2013, 12(2): 140-151.
[9]  OZGUR K, RUAN D. A comparison study of fuzzy MADM methods in nuclear safeguards evaluation[J]. Journal of Global Optimization, 2011,51(2): 209-226.
[10]  WOO T H,LEE U C. Safeguard assessment in nuclear power plants (NPPs) operations using analytic hierarchy process (AHP) and production function[J]. Energy Exploration & Exploitation, 2011,29(3): 337-355.
[11]  彭敏俊. 船舶核动力装置[M]. 北京:原子能出版社,2009:101-110.
[12]  汤?安. 基于AHP的道桥建设最佳顺序决策计算[J]. 交通信息与安全,2009, 27(1): 71-74.TANG Yu’an. Decision-making computation of the best bridges and roads construction sequence based on AHP[J]. Traffic Information and Security,2009, 27(1): 71-74.