XIE Shi-leng, LIU Ying. Reliability based design of vertical breakwaters[A].Proceedings of International Conference on Port Development for the Next Millennium[C]. Hong Kong, Hong Kong Institution of Engineers, 1992. 419-423.
[4]
BENASSAI E, CALABRESE M, UBERTI G, et al. Reliability analysis of existing breakwaters[ A ].Proceedings of the Tenth International Off-shore and Polar Engineering Conference[ C]. Seattle: The International Offshore and Polar Engineers, 2000. 568-575.
[5]
BALAS C E, KOC L. Risk assessment of vertical breakwaters-a case study in Turkey[J]. China Ocean Engineering, 2002, 16( 1 ) : 123-134.
[6]
刘颖 谢世楞.直立堤工程的可靠性指标核算[J].港工技术,1990,(4):1-5,31.
[7]
JTJ213—98.海港水文规范[S].[S].北京:中华人民共和国交通部,..
[8]
刘颖 谢世楞.关于直立式防波堤分项系统的确定[J].港工技术,1993,(4):11-17,.
[9]
BURCHARTH HF, SORENSEN J Dalsgaard,CHRISTIA Erik. On the evaluation of failure probability of monolithic vertical wall breakwaters[A].Proceedings of Wave Barriers in Deep Waters[C]. Yokosuka: Port and Harbour Research Institute, 1994. 458-468.