Kozub DD,Liehr SK. Assessing denitrification rate limiting factors in a constructed wetland receiving landfill leachate. Water Research,1999,40(3):75-82.
[6]
Phipps RG,Crumpton WG. Factors affecting nitrogen loss in experimental wetlands with different hydrologic loads. Ecological Engineering,1994,3(4):399-408.
International Water Association(IWA). Constructed wetland for pollution control process,performance,design and operation. London:IWA Publishing,2000:12-23.
[13]
Fleming-Singer MS,Horne AJ. Enhanced nitrate removal efficiency in wetland microcosms using an episediment layer for denitrification. Environmental Science and Technology,2002,36(6):1230-1237.
[14]
陆松柳,胡洪营. 人工湿地的反硝化能力研究. 中国给水排水,2008,24(7):63-69.
[15]
Ingersoll TD,Baker LA. Nitrate removal in wetland microcosms. Water Research,1998,32(2):667-684.
[16]
Huett DO,Morris SG,Smith G et al. Nitrogen and phosphorus removal from plant nursery runoff in vegetated and unvegetated subsurface flow wetlands. Water Research,2005,39:3259-3272.
[17]
Lin YF,Jing SR,Wang TW et al. Effects of macrophytes and external carbon sources on nitrate removal from groundwater in constructed wetlands. Environmental Pollution,2002,119:413-420.