LI Heng, CAO J N, LOVE P E D. Using machine learning and GA to solve time-cost tradeoff problems [J]. Journal of Construction Engineering and Management, 1999(5):347-353.doi:10.1061/(ASCE)0733-9364(1999)125:5(347).
[2]
WALKER E D. Planning and controlling multiple, simultaneous, independent projects in a resource constrained environment [D]. Georgia:University of Georgia, 1998.
JESUS P, DAVID R I, FABRIZIO R. Modeling external risks in project management [J]. Risk Analysis, 2007(4):961-978.doi:10.1111/j.1539-6924.2007.00935.x.
[5]
EDEN C T, WILLIAMS F, ACKERMAN. The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D & D) in major projects [J]. Journal of the Operational Research Society, 2000(3):291-300.
[6]
DECLRP R F, HEBERT J E, VERDINI W A. Nonlinear time/cost tradeoff models in project management [J]. Computers & Industrial Engineering, 1995(2):219-229.
PALOMO J, RIOS I D, RUGGERI F. Dynamic models with expert input with applications to project cost forecasting [R]. Madrid:Universidad Rey Juan Carlos, 2004.
[11]
HOWICK S, EDDENC. The impact of disruption and delay when compressing large projects:Going for incentives [J]. Journal of the Operational Research Society, 2001(1):29-34.doi:10.1057/palgrave.jors.2601045.
[12]
WILLIAMS T. Seeking optimum project duration extensions [J]. Journal of the Operational Research Society, 1999(5):460-467.
[13]
WILLIAMS T, EDEN C, ACKERMAN F. The effects of design changes and delay on project costs [J]. Journal of the Operational Research Society, 1995(7):809-818.
[14]
MANUEL L, PILAR L, P?REZ A. Minimizing weighted tardiness of jobs with stochastic interruptions in parallel machines [J]. European Journal of Operational Research, 2000(2):444-457.doi:10.1016/S0377-2217(99)00495-6.