杨树标,王娜,贾剑辉.混凝土框架结构破坏机制研究分析[J].湘潭大学自然科学学报,2011(4),33:54-57. Yang Shubiao,Wan Na,Jia Jianhui.The Failure Mechanism Analysis of the Concrete Frame Structue[J],College of Civil Engineering,Hebei University of Engineering,2011(4),33:54-57.
[2]
杨树标,郭恩平,贾剑辉. 设置少量剪力墙的多层框架结构破坏机制研究[J].煤炭工程,2012,3:114-116. Yang Shubiao,Guo Enping,Jia Jianhui.The Failure Mechanism Analysis of the Multilayer Concrete Frame Structue which Set a Small Amount of Shear Wall[J].Coal Engineering,2012,3:114-116.
[3]
潘 鹏,曹海韵,叶列平,等.混凝土框架增设摇摆墙前后抗震性能比较[J].土木建筑与环境工程,2010,32(s2):326-328. Pan Peng,Cao Haiyun,Ye Lieping,et al.Seismic Performance Comparison After the Concrete Frame Increasing Swing Wall[J].Journal of Civil,Architectural & Environmental Engineering, 2010, 32(s2):326-328.
[4]
包世华,张铜生.高层建筑结构设计和计算[M].北京:清华大学出版社,2010:191-221. Bao shihua,Zhang Tongsheng.Design and Analysis of Tall-building Structure[M].Beijing:Tsinghua University Press,2010:191-221.
[5]
GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010. GB50011-2010Code for Seismic Design of Buildings[s].Beijing:China Building Industry Press,2010
[6]
曲哲.摇摆墙-框架结构抗震损伤机制控制及设计方法研究[D].北京:清华大学土木工程学院,2010. Qu Zhe.Study on Seismic Damage MechanismControl and Design of RockingWall-Frame Structures[D].Beijing:School of Civil Engineering, Tsinghua University,2010
[7]
SAP2000中文版使用指南[M].北京:人民交通出版社,2012:456-508. The Chinese Version of SAP2000 Use Guide[M].Beijing:China Communications Press, 2012:456-508.