Morrison R D,Richardson J M.JKsimMet-asimulator for analysis,optimasation and design of comminution circuits[C]//Mineral Processing Plant Design,Practice and Control Conference,Vancouver,B C.,Canada.New York:Society for Mining,Metallurgy and Exploration,2002:442- 460.
[12]
Lynch A J.Mineral Crushing and Grinding Circuits:Their Simulation,Optimization Design and Control[M].New York:Elsevier,1977.
[13]
Napier-Munn T J,Morrell S,Morrison R D,et al.Mineral Comminution Circuits:Their Operation and Optimization[M].Bris-bane:Julius Kruttschnitt Mineral Research Centre,University of Queensland,1996.
Chibwe P,Simukanga L K,Witika L K.Designing and testing the representative samplers for sampling a milling circuit at Nkana copper/cobalt concentrator[J].African Journal of Science and Technology,2005,6(2):102-112.
[17]
Genc O.Optimization of a fully air-swept dry grinding cement raw meal ball mill closed circuit capacity with theaid of simulation[J].Minerals Engineering,2015,74:41-50.
[18]
Irannajad M,Farzanegan A,Razavian S M.Spreadsheet-based simulation of closed ball milling circuits[J].Minerals Engineering,2006,19(15):1495-1504.
[19]
Samanli S,Cuhadaroglu D,Kizgut S.A simulation study of laboratory scale ball and vertical stirred mills[J].Particle and Particle Systems Characterization,2009,26(5):256-264.