全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

一种面向绿色制造的多目标车间调度方法

, PP. 106-112

Keywords: 机械工程,绿色制造,多目标,遗传算法,模糊优选

Full-Text   Cite this paper   Add to My Lib

Abstract:

提出了一种新的面向绿色制造的多目标车间调度方法,通过将调度目标分解为竞争性指标和可持续性指标,分别建立了竞争性指标的调度模型和可持续性指标的评价模型,并基于改进的遗传算法求解出多组满足竞争性指标的Pareto最优解;然后从这些解中模糊优选出可持续性指标值最好的协调解,即为所求的绿色调度方案。实例研究表明,该方法在保证生产效益的前提下,能够使制造过程的资源消耗和环境影响最小,有效地解决了绿色制造中的多目标调度优化问题。

References

[1]  William F G,Stephen B,Patrick P.Intelligent manufacturing and environmental sustainability[J].Robotics and Computer Integrated Manufacturing,2007,23(6):704-711.
[2]  谭显春,刘 飞,曹华军.绿色制造的一种工艺路线决策模型及其求解算法[J].机械工程学报,2004,40(4):154-159. TAN Xian-chun,LIU Fei,CAO Hua-jun.Decision-making model for process route in green manufacturing and its algorithms[J].Chinese Journal of Mechanical Engineering,2004,40(4):154-159.
[3]  Bennett D P,Yano C A.A decomposition approach for an equipment selection and multiple product routing problem incorporation environmental factors[J].European Journal of Operational Research,2005,15(6):643-664.
[4]  Jovane F,Yoshikawa H,Alting L,et al.The incoming global technological and industrial revolution towards competitive sustainable manufacturing[J].CIRP Annals Manufacturing Technology,2008(57):641-659.
[5]  吴秀丽,孙树栋,余建军,等.多目标柔性作业车间调度优化研究[J].计算机集成制造系统,2006,12(5):731-736. WU Xiu-li,SUN Shu-dong,YU Jian-jun,et al.Research on multi-objective optimization for flexible job shop scheduling[J].Computer Intergrated Manufacturing Systems,2006,12(5):731-736.
[6]  Dahmus J B,Gutowski T G.An environmental analysis of machining[J].Proceedings of International Mechanical Engineering Congress and RD&D Expo,2004,12(42):1-10.
[7]  Berlin J,Sonesson U,Tillman A M.A life cycle based method to minimize environmental impact of dairy production through product sequencing[J].Journal of Cleaner Production,2005(7):1-10.
[8]  藩全科,左朝凤,朱剑英.面向绿色制造模式的Petri网模型及优化算法[J].机械工程学报,2006,42(9):48-53. FAN Quan-ke,ZUO Chao-feng,ZHU Jian-ying.Petri net based model for job shop scheduling problem in green manufacturing and its hybrid metaheuristic search[J].Chinese Journal of Mechanical Engineering,2006,42(9):48-53.
[9]  HE Yan,LIU Fei,CAO Hua-jun,et al.A bi-objective model for the job-shop scheduling problem to minimize both energy consumption and makespan[J].Journal of Central South University of Technology,2005,12(S2):167-171.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133