李祖仲,陈拴发,张登良,等.应力吸收层沥青混合料的路用特性[J].长安大学学报:自然科学版,2008,28(2):5-8. LI Zu-zhong,CHEN Shuan-fa,ZHANG Deng-liang,et al.Road performance of stress absorbing layers in asphalt mixture[J].Journal of Chaug'an University:Natural Science Edition,2008,28(2):5-8.
[3]
王 艳,倪富健,马 翔.不同基层开裂状态的沥青路面应力对比[J].交通运输工程学报,2008,8(6):34-39. WANG Yan,NI Fu-jian,MA Xiang.Stress comparison of asphalt pavements with different base crack states[J].Journal of Traffic and Transportation Engineering,2008,8(6):34-39.
[4]
谢祥根.同步碎石封层技术和SBS改性沥青防水层的应用研究[J].湖南交通科技,2007,33(1):10-14,44. XIE Xiang-geng.Research on the application of synchronous pavement surface dressing and SBS modified asphalt waterproof layer[J].Hunan Communication Science and Technology,2007,33(1):10-14,44.
[5]
覃 峰,包惠明,董开亮.同步碎石应力吸收层特性研究[J].中外公路,2007,27(5):202-205. QIN Feng,BAO Hui-ming,DONG Kai-liang.Study on the properties of synchronous gravel stress absorbed layer[J].Journal of China & Foreign Highway,2007,27(5):202-205.
[6]
王朝辉,王选仓.基于沥青加铺层结构疲劳寿命的夹层位置确定[J].中国公路学报,2008,28(1):29-34,58. WANG Chao-hui,WANG Xuan-cang.Interlayer position ascertainment based on fatigue life of asphalt overlay structure[J].China Journal of Highway and Transport,2008,28(1):29-34,58.
[7]
张俊豪.同步碎石封层技术在桥面防水结构层中的应用[J].山西交通科技,2008(2):65-66. ZHANG Jun-hao.The application of synchronous macadam seal technique to water proof structure layer[J].Shanxi Science & Technology of Communications,2008(2):65-66.
[8]
邹 剑,蒋功雪.同步碎石封层技术在沥青路面预防性养护中的应用[J].湖南交通科技,2007,33(2):33-35. ZOU Jian,JIANG Gong-xue.The application of synchronous pavement surface dressing technology in asphalt pavement[J].Hunan Communication Science and Technology,2007,33(2):33-35.