张丰焰,周 伟.高速公路改扩建工程交通组织设计探讨[J].公路,2006(1):109-113. ZHANG Feng-yan,ZHOU Wei.Discussion about traffic operation design for reconstruction and expansion engineering of expressways[J].Highway,2006(1):109-113.(in Chinese)
[2]
Chen H C,Schonfeld P.Work zone lengths for a four-lane road with an alternate route[R].Washington DC:Transportation Research Board,2003.
[3]
Chien S,Schonfeld P.Optimal work zone lengths for four-lane highways[J].Journal of Transportation Engineering,2001,127(2):124-131.
[4]
Byrd P S,Pesti G,Jessen D S,et al.Traffic flow characteristics of the late merge work zone control strategy[R].Washington DC:Transportation Research Board,1999.
[5]
徐美丽.高速公路改扩建施工区交通流组织研究[D].西安:长安大学,2011. XU Mei-li.Study on traffic organization in reconstruc-tion and extension work zone of expressway [D]. Xi'an: Chang'an University,2011.(in Chinese)
[6]
裴玉龙,张亚平.道路交通系统仿真[M].北京:人民交通出版社,2004. PEI Yu-long,ZHANG Ya-ping.Road traffic system simulation[M].Beijing: China Communication Press,2004.(in Chinese)
[7]
周茂松,吴 兵,盖松雪.高速公路养护维修作业区通行能力影响因素的微观仿真研究[J].交通与计算机,2004,22(6):54-57. ZHOU Mao-song,WU Bing,GAI Song-xue.Micro-simulation of factors affecting passing capacity in freeway maintenance work zones[J].Computer and Communications,2004,22(6):54-57.(in Chinese)
[8]
李永义.高速公路施工路段交通组织方案设计与评价研究[D].南京:东南大学,2006. LI Yong-yi.Study on traffic organization and project evaluation of expressway works sections[D]. Nanjing: Southeast University,2006.(in Chinese)
[9]
袁春建.高速公路养护区交通组织仿真研究[D].西安:长安大学,2009. YUAN Chun-jian.Research on traffic organization simulation of expressway work zone[D].Xi'an: Chang'an University,2009.(in Chinese)